Skip to main content
Advertisement
Browse Subject Areas
?

Click through the PLOS taxonomy to find articles in your field.

For more information about PLOS Subject Areas, click here.

  • Loading metrics

Study on Failure of Third-Party Damage for Urban Gas Pipeline Based on Fuzzy Comprehensive Evaluation

  • Jun Li,

    Affiliations College of Mechanical and Transportation Engineering, China University of Petroleum, Beijing, China, PetroChina Kunlun Gas Co., LTD, Beijing, China

  • Hong Zhang,

    Affiliations College of Mechanical and Transportation Engineering, China University of Petroleum, Beijing, China, China University of Petroleum (Beijing) Karamay Campus, Karamay, China

  • Yinshan Han,

    Affiliation College of Mechanical and Transportation Engineering, China University of Petroleum, Beijing, China

  • Baodong Wang

    wangbaodong58@163.com

    Affiliation College of Mechanical and Transportation Engineering, China University of Petroleum, Beijing, China

Abstract

Focusing on the diversity, complexity and uncertainty of the third-party damage accident, the failure probability of third-party damage to urban gas pipeline was evaluated on the theory of analytic hierarchy process and fuzzy mathematics. The fault tree of third-party damage containing 56 basic events was built by hazard identification of third-party damage. The fuzzy evaluation of basic event probabilities were conducted by the expert judgment method and using membership function of fuzzy set. The determination of the weight of each expert and the modification of the evaluation opinions were accomplished using the improved analytic hierarchy process, and the failure possibility of the third-party to urban gas pipeline was calculated. Taking gas pipelines of a certain large provincial capital city as an example, the risk assessment structure of the method was proved to conform to the actual situation, which provides the basis for the safety risk prevention.

Introduction

As infrastructures of cities and towns, urban gas pipelines crossing streets and lanes are vulnerable to the third-party construction activities [1]. For example, an explosion occurred in a village of Beijing on April 10, 2016, causing 1 person dead, 2 people hurt and 300 square meters area burned. The reason was the rupture of gas pipeline in the process of digging [2]. According to the Study on Current Situation and Countermeasures of Urban Gas Safety Regulation System of China Gas Association, there were 1789 urban gas accidents from 2010 to 2012, and 608 of them were induced by the third-party constriction activities. The third-party damage has become a main cause of gas pipeline accidents, so it is necessary to study on the evaluation of the failure probability [36].

The third-party damage to urban gas pipeline is always caused by non-gas supply organization, not including natural calamities. The reasons of the third-party damage are various, leading strong randomness of occurrence of the damage, so it is hard to prevent [7]. In 2005, the United States gas group completed the gas industry research and found that nearly 35% serious incidents were caused by the third-party damage. From 1971 to 1994, among the European pipeline failure events, third party damage accounted for 32.6%, a variety of mechanical failure accounted for 25.4%, and the corrosion accounted for 30.4% [8]. FTA is an extensively used deductive analysis method to provide logical functional relationships among components and subsystems of a system by graphical description. It has been widely used in many fields, such as railway systems [9], electric power [10], and oil and gas transmission [11]. Fuzzy set theory can provide an efficient mathematical framework for estimating failure rates when available information is uncertain, incomplete, imprecise, or vague [12]. Singer [13] used a fuzzy set approach to demonstrate the relative frequencies of the basic events. Shu et al. [14] performed the failure analysis of printed circuit board assembly by integrating experts’ judgment about the possibility of failure of bottom events and by means of a triangular IFS to obtain the intuitionistic fuzzy fault tree interval. Shi et al. [15] proposed a combination of improved analysis hierarchy process (AHP) and fuzzy fault tree analysis (FFTA) to evaluated the probability of fire and explosion accidents for storage tanks (FEASOST), basing on a world-wide accident investigation of oil tanks. Lu et al. [16] performed a comprehensive risk evaluation of an underwater pipeline carrying natural gas by combining the fuzzy method with a bow-tie model. Nieto-Morote et al. [17] presented a new methodology based on the Fuzzy Set Theory and Analytic Hierarchy Process (AHP) for construction project risk analysis. Xu et al. [18] built up a third-party damage failure assessment model of urban gas pipeline network which is made up of 19 second-hierarchy and 5 first-hierarchy factors. Yang [19] proposed a mathematical model of third-party damage by fault tree analysis and fuzzy comprehensive analysis. Miao et al. [20] analyzed the failure factors of buried gas pipeline by fault tree analysis, and evaluated the failure probability and failure consequence by fuzzy comprehensive assessment method.

As mentioned above, a series of researches of the failure probability evaluation are based on the fuzzy method, but few attempted to access the failure probability of pipelines induced by the damage of third-party. In addition, the selection of risk factors in most of the previous studies on the third-party damage to gas pipelines was on the basis of statistical accident data, which is somewhat partial and not systematical. In the paper, according to the comprehensive identification on site of third party damage to the gas pipeline, a fault tree of third-party damage to urban gas pipeline was built, which contains 56 basic events. Applying fuzzy comprehensive evaluation method to the third-party damage of urban gas pipeline, not only the uncertainty of third-party damage could be reflected, but also the risk of failure can be quantified. The AHP was utilized to estimate expert ability. The evaluation of basic event probability was revised, and a group of evaluation results closer to objective probability was obtained according to the evaluation results of expert ability. The methodology proposed in this paper could provide insights for the safety evaluation for urban gas pipelines.

Application of AHP in Determination of Expert Weight

Before introducing the evaluation methodology, the application of AHP in the determination of expert weight is proposed here. The evaluation result will be different, considering individual knowledge level, experience and perspective of experts. A model about factors which influence experts’ evaluation ability was created, and an evaluation matrix was built and the weighted correction to experts’ evaluation was carried out by AHP, according to personal situation of experts who take part in evaluation [21].

AHP hierarchy model building

An evaluation hierarchy analysis model of expert ability evaluation was built with the following three hierarchies. The first is overall index based on experts’ individual ability. The second is sub index based on personal knowledge, personal experience, information source and unbiased. The third is each expert. The details were presented in Fig 1.

Construction of pairwise evaluation matrix

Evaluation matrix is an expression of quantifying each hierarchy of related factors. It can adequately reflect the people’s preference among all hierarchy factors related to a certain upper hierarchy [22]. In this paper, the relative importance of each factor is quantified according to index scale.

Step 1: Expert ability description

Experts coming from different fields are engaged to form evaluation groups. Some are experienced, and some are solid in theoretical basis.

Step 2: Affecting factors ranking

The importance of each factor which influences expert evaluation ability was compared: PK = PE>IS>UB.

Step 3: Construction of evaluation matrix

The rule of building matrix is that when the value in matrix Cij represents the superiority of Ui relative to that of Uj when comparing Ui with Uj, which is met with the following relationship.

(1)

Index scale was used in this paper, and details were presented in Table 1. For example, U1 is slightly important to U3, then C13 = 1.3161, and C31 = 1/1.3161 = 0.7598.

The weight effect of each index on overall index can be derived by root algorithm: (2) Where k represents the index number of affecting expert evaluation ability, and wBE,I represents the weight of index i, which affects expert evaluation ability.

According to index scale and the affecting factors ranking, the priority relation matrix of each index affecting the ability of expert evaluation was obtained, and the weights are calculated by Eq 2, as shown in Table 2.

thumbnail
Table 2. The priority relation matrix of each index affecting the ability of experts evaluation.

https://doi.org/10.1371/journal.pone.0166472.t002

Similarly, the weight equation of different expert for a certain index is as follows. (3) Where wi,j represents the weight of expert j relative to expert ability index i; c’jk represents the superiority of expert j to expert k for the same index i.

Experts should be selected from different fields, such as the design, construction and installation, maintenance, management and safety of the town gas pipeline, who had no connection with the corporation to be evaluated. Comparing the personal knowledge of each expert, the priority relation matrix of personal knowledge and weight was obtained. An example of the priority relation matrix of personal knowledge and weight was shown in Table 3.

thumbnail
Table 3. The priority relation matrix of personal knowledge and weight.

https://doi.org/10.1371/journal.pone.0166472.t003

Total sequencing of expert hierarchy

The expert weights can be obtained from Eq 6. (4) where k is the number of evaluation index and wei is the weight of expert i.

Methodology

The fuzzy evaluation on third-party damage to urban gas pipeline was carried out basing on the establishment of the fault tree. The expert evaluation method was chosen to determine the probabilities of various basic events. As it is hard to define specific values of probabilities, experts often describe the probabilities by the degree of the occurrence, such as very small, relatively small or large. The critical point is to convert these indefinite judgement to probability of occurrence. With the application of AHP and fuzzy evaluation method, the basic event probabilities were derived, and the probability of top event could be calculated accordingly.

Establishment of a fault tree

The third-party damage to urban gas pipeline was selected as the top event in this paper, and all direct reasons that led to top event were chosen as intermediate events. They were connected by appropriate logic gates, such as coincidence gate and distance gate, according to the logical relationship between them [23]. Each intermediate event was analyzed from top to bottom by the same way until all the input events didn’t need to be analyzed again, obtaining all the basic events of the fault tree. The fault tree can be established by connecting the top event, intermediate events and basic events with standard notation of fault tree analysis according to the logical relationship [24]. There are 1 top event and 56 basic events of the third-party damage fault tree, as shown in Fig 2 and Table 4.

thumbnail
Fig 2. Fault tree model for third-party damage to urban gas pipeline.

https://doi.org/10.1371/journal.pone.0166472.g002

thumbnail
Table 4. The top event and basic events of the third-party damage fault tree.

https://doi.org/10.1371/journal.pone.0166472.t004

Calculation of the basic event fuzzy probability

There are many risk factors of third-party damage to urban gas pipeline, such as digging, poor responsibility of inspectors and cooperation of construction units, which are with uncertainty and randomness. In this paper, the fuzzy set theory of fuzzy mathematics was used to quantizing the factors, and the membership function of fuzzy sets were determined by trapezoidal and triangular distribution, to determine the membership function of the fuzzy set f(x), deriving the fuzzy probabilities of basic events[18].

Step 1: Subjective judgments about basic events

In order to reconcile both the accuracy and workload, the evaluation scope of basic events was set as: very small (VS), small(S), relatively small (RS), medium (M), relatively large (RL), large (L) and very large (VL).

Step 2: Quantification of expert opinion by membership function

Expert evaluating opinions were processed by α-cuts of fuzzy numbers [19], obtaining the relation function of fuzzy numbers x corresponded to each fuzzy language (Fig 3): (5) where a and b represent the upper and lower bounds of the fuzzy number of natural language.

(6)(7)

Therefore, the α-cuts of the fuzzy numbers are derived as follows.

,,,,,,.

Then the fuzzy number of one basic event can be obtained by the α-cuts integrated with the expert weight according the following steps. (8) where Wwi is the fuzzy number of basic event i, wej is the weight of expert j, Wij is the fuzzy number evaluated by expert j, m and n are the total number of events and experts, respectively.

Step 3: Calculation of the fuzzy probability value

The fuzzy number was converted to the fuzzy probability value FPS according to the method of L-R fuzzy numbers ranking [25, 26], and the largest fuzzy set and the minimal fuzzy set was defined as follows.

The left and right fuzzy probability values of fuzzy number Wwi integrated with wej is: (9) (10)

Therefore, the fuzzy probability value of the fuzzy number Wwi is: (11)

Step 4: Conversion of the fuzzy probability score (FPS) into fuzzy failure rate (FTR) (12) (13)

The fuzzy probability value can be derived according to above steps.

Calculation of failure probability

The final goal of the fault tree quantitative analysis is to obtain the probability of the top event. The failure probability of gas pipeline system induced by third-party damage, which was quantitatively evaluated according to the fault tree. The quantitative analysis principle is as follows. Assuming that xi is the occurrence probability of basic event i, and Y is the occurrence probability of top event.

The probability of fault tree can be described by minimal cut sets which are connected by distance gates, and the probability function is: (14)

According to exponential scale tables, the matrix of expert weight was obtained by the method of AHP and the matrix of expert ability weight. Then the weight calculation of evaluation results on some certain pipelines given by experts was accomplished, and the failure probability of pipelines was derived.

Fuzzy Evaluation of an Urban Gas Pipeline

A medium pressure urban gas pipeline of Harbin Zhongqing Gas Company, Heilongjiang Province was selected as a calculation example. The PE pipeline is located in the center of the city, with the length of 7.2km, the actual average depth of 1.7m and the pressure of 0.28MPa.

Determination of the weight of expert ability

The 6 experts of the evaluation group were selected from different fields, such as the design, construction and installation, maintenance, management and safety of the town gas pipeline, who had no connection with the corporation to be evaluated. The priority relation matrix of personal knowledge and weight was set as the same as given in Section of Construction of pairwise evaluation matrix, and the rest matrixes, i.e., the priority relation matrix of expert personal experience, information source and unbiased were shown in Tables 57.

thumbnail
Table 5. The priority relation matrix of personal experience and weight.

https://doi.org/10.1371/journal.pone.0166472.t005

thumbnail
Table 6. The priority relation matrix of information source and weight.

https://doi.org/10.1371/journal.pone.0166472.t006

thumbnail
Table 7. The priority relation matrix of personal unbiasedness and weight.

https://doi.org/10.1371/journal.pone.0166472.t007

By the calculation procedure introduced in Section of Total sequencing of expert hierarchy, the expert weights were calculated below: we = (0.2373, 0.2019, 0.1236, 0.1652, 0.1284, 0.1436).

Evaluation of risk factors

56 basic events in Section of Methodology were selected as risk factors to compile the assessment questionnaire. 6 experts filled the evaluation form based on the field investigation and personal experience and knowledge, as shown in Table 8.

Failure probability of the pipeline

The expert fuzzy evaluation was quantified by using the theory of fuzzy mathematics introduced in Section of Methodology, deriving the fuzzy probabilities of basic events of relevant pipes. Take the basic event of digging for example. According to the expert scoring on it, i.e., VS, VL, VL, VL, VL and VL, the fuzzy number of the basic event integrated with expert weight Wwi can be described as follows.

Therefore, the expert weight integrated function of the fuzzy number x (Fig 4) can be described as:

(15)

The values of FPS and FPR are as follows: FPSL(x) = 0.36221, FPSR(x) = 0.79138, FPS(x) = 0.714585 and FPR = 0.020207. So the failure rate of digging is 0.020207.

As the calculation is tedious, the MATLAB software can be utilized. After the calculation of failure rates of all basic events, the failure probability of the gas pipeline was derived to be 1.55%. From site record, Harbin Zhongqing Gas Company has 1958 km gas pipeline, occurred 23 accidents of third-party damage in 2015, as shown in Table 9. The number of accidents to third-party damage is 0.0117 / (km∙a-1). By referring to related accident records of the gas pipeline, it was generally consistent with result of high failure. Therefore, some measures should be taken to reduce the risk of the third-party damage to pipelines.

thumbnail
Table 9. Third-party damage to gas pipeline accidents in 2015.

https://doi.org/10.1371/journal.pone.0166472.t009

Conclusions

A failure evaluation of third-party damage for urban gas pipelines was conducted in this paper, combing AHP and fuzzy comprehensive evaluation method. Conclusions can be drawn as follows:

  1. The fault tree which top event was the third-party damage to urban gas pipeline was systematically established in this paper, which contains 56 basic events.
  2. Based on the fuzzy set theory, 56 risk factors of the third-party damage to urban gas pipelines were quantified to compute the fuzzy probabilities.
  3. A hierarchy model of influence factors of abilities of expert evaluation was built by the improved analytic hierarchy process. The matrix of evaluation was built according to the personal information of experts, and the expert evaluation was weighting modified by AHP, whose results were more close to the objective probability.
  4. Based on the method of comprehensive fuzzy evaluation, the failure probability was derived by practical application, which was in agreement with the statistical data of the gas company, verifying the feasibility and effectiveness of evaluation methods and models.

Author Contributions

  1. Data curation: JL.
  2. Formal analysis: JL YH.
  3. Investigation: JL BW.
  4. Methodology: JL HZ.
  5. Resources: JL.
  6. Writing – original draft: JL YH.
  7. Writing – review & editing: JL BW.

References

  1. 1. Huang XM, Peng SN, Yang JJ. Investigation and Analysis on Failure of Gas Pipeline in Typical Domestic Cities. Gas & Heat. 2010;30: 26–29
  2. 2. The China news online service. Beijing old district gas deflagration accident occurred[EB/OL]
  3. 3. Zhao JP. Fuzzy comprehensive analysis method and its application in the third-party damage assessment of the buried gas piping. Natural Gas Industry. 2008:28:103–105
  4. 4. Chiara V, Giuseppe M. Quantitative risk assessment of the Italian gas distribution network, Journal of Loss Prevention in the Process Industries. 2014;31:5–17
  5. 5. Emous A V, Harmsen D. Reducing digging incidents using risk management, In: International Gas Union.23rd World Gas Conference, International Gas Union: Amsterdam (Netherlands). 2006; pp. 91–108.
  6. 6. Montiel H, Vilchez J A, Arnaldos J, Casal J. Historical analysis of accidents in the transportation of natural gas, J. Hazard. Mater. 1996; 51: 77–92.
  7. 7. Zhu ZJ, Yang XX. Fuzzy fault tree analysis of urban underground gas pipelines, Journal of Hefei University of Technology.2007; 30: 1686–1690.
  8. 8. Sljivic S. Pipeline safety management and the prevention of third-party interference, Pipes & Pipe lines International.1995; 40:14–16.
  9. 9. Svedung I., Andersson R., Ra H.. Suicide prevention in railway systems: application of a barrier approach, Safety Science. 2008; 46:729–737.
  10. 10. Volkanovski A., Cepin M., Mavko B.. Application of the fault tree analysis for assessment of power system reliability, Reliab. Eng. Syst. Safe. 2009; 94:1116–1127.
  11. 11. Dong YH, Yu DT. Estimation of failure probability of oil and gas transmission pipelines by fuzzy fault tree analysis, J. Loss Prev. Ind.2005; 18:83–88.
  12. 12. Yang AL, Huang GH, Qin XS, Fan YR. Evaluation of remedial options for a benzene-contaminated site through a simulation-based fuzzy-MCDA approach, J. Hazard. Mater.2012; 213–214: 421–430. pmid:22390955
  13. 13. Singer D.. A fuzzy set approach to fault tree and reliability analysis, Fuzzy Set. Syst.1990; 34:145–155.
  14. 14. Shu MH, Cheng CH, Chang JR. Using intuitionistic fuzzy sets for fault-tree analysis on printed circuit board assembly, Microelectron. Reliab.2006; 46: 2139–2148.
  15. 15. Shi L, Shuai J, Xu K. Fuzzy fault tree assessment based on improved AHP for fire and explosion accidents for steel oil storage tanks. Journal of Hazardous Materials. 2014; 278:529–538. pmid:25010458
  16. 16. Lu L, Liang W, Zhang L. A comprehensive risk evaluation method for natural gas pipelines by combining a risk matrix with a bow-tie model. Journal of Natural Gas Science & Engineering. 2015; 25:124–133.
  17. 17. Nieto-Morote A, Ruz-Vila F. A fuzzy approach to construction project risk assessment. International Journal of Project Management.2011; 29(2):220–231.
  18. 18. Tao-Long X U, Hong-Ye P. Study on Failure Possibility of Third-party Damage to the Urban Gas Pipeline Network Based on Fuzzy Comprehensive Evaluation. China Safety Science Journal. 2010; 20(8):165–169.
  19. 19. Yang YC. Assessment Method for Evaluating Damage of Urban Gas Pipeline by the Third Party. Pipeline Technique & Equipment, 2007; 4:12–14.
  20. 20. Miao C, Zhao J. Fuzzy Risk Analysis for the Urban Buried Gas Pipeline. 2008; 13–19.
  21. 21. Wei CR, Li YX, Sun JH, Gong ZC, Xing SR. Solution method for accident tree structural importance, Journal of Heilongjiang Institute of Science & Technology.2012; 22:84–88.
  22. 22. Li Q, Lu TJ. The study on the methods of fuzzy Signficance analysis, Fuzzy Systems and Mathematics.2000; 14: 89–93.
  23. 23. Chen LX. Study on quantitative risk assessment for the long-distance oil\gas pipelines in service, South West Petroleum Institute.2004; 10–15.
  24. 24. Chen S J J, Hwang C L/M J, Krelle W. Fuzzy multiple attribute decision making: methods and applications. Spinger-Verlag New York, Inc, 1992:1–531.
  25. 25. Zhang ZG, Zhu XF. Safety assessment to urban gas transmission and distribution system based on fuzzy fault tree, Journal of Shandong University of Architecture.2006; 21:239–242.
  26. 26. Li WN, Gao HL, Ma L. The solution of the minimal cut set of the fault tree of the submarine torpedo emergency control system, Journal of Sichuan Ordnance.2010; 31(8):43–46.