Next Article in Journal
Health and Wellness Impacts of Traditional Physical Activity Experiences on Indigenous Youth: A Systematic Review
Next Article in Special Issue
Age-Dependent Influence of Intrinsic and Extrinsic Motivations on Construction Worker Performance
Previous Article in Journal
Health Anxiety Predicts Postponing or Cancelling Routine Medical Health Care Appointments among Women in Perinatal Stage during the Covid-19 Lockdown
Previous Article in Special Issue
Linking Challenge–Hindrance Stressors to Safety Outcomes and Performance: A Dual Mediation Model for Construction Workers
 
 
Font Type:
Arial Georgia Verdana
Font Size:
Aa Aa Aa
Line Spacing:
Column Width:
Background:
Article

A Study Investigating How the Characteristics of High Reliability Organisations Can Be Measured in the Construction Industry in Australia

1
School of Health Sciences, University of Newcastle, Callaghan, NSW 2308, Australia
2
Centre for Resources Health and Safety, University of Newcastle, Callaghan, NSW 2308, Australia
*
Author to whom correspondence should be addressed.
Int. J. Environ. Res. Public Health 2020, 17(21), 8273; https://0-doi-org.brum.beds.ac.uk/10.3390/ijerph17218273
Submission received: 13 September 2020 / Revised: 5 November 2020 / Accepted: 6 November 2020 / Published: 9 November 2020
(This article belongs to the Special Issue Occupational Safety and Risks in Construction)

Abstract

:
Construction activities involve a lot of risk as workers are exposed to a wide range of job hazards, such as working at height, moving vehicles, toxic substances, and confined spaces. The hazards related to a construction project are mostly unpredictable because construction projects move quickly due to project deadlines, and changing work environments. As a result of this, the industry accounts for one of the highest numbers of work-related claims, and the fourth highest incidence rate of serious claims in Australia. This research investigates how key safety management factors can measure the characteristics of high reliability organisations (HROs) in the construction industry in New South Wales Australia. To address the problem, a model is presented that can predict characteristics of HRO in construction (CHC). Using structural equation modeling (SEM), and confirmatory factor analysis (CFA), the model and measurement instruments are tested and validated from data collected from construction workers. The results identified the factors that effectively measure CHC, and the findings can also be used as a safety management strategy and will contribute to the body of knowledge in research.

1. Introduction

In the attempt to improve work health and safety, Safe Work Australia developed a strategy that seeks to influence key national activities in all industrial sectors, with more focus on sectors with increased rates of injuries and fatalities. The strategy is also targeted towards policy makers, regulators, and those in the position to improve work health and safety in the workplace across Australia [1].
To achieve the Strategy, three national targets must be attained by 2022, which are; (i) a reduction in the number of worker fatalities due to injury of at least 20%, (ii) a reduction in the incidence rate of claims resulting in one or more weeks off work of at least 30%, and (iii) a reduction in the incidence rate of claims for musculoskeletal disorders resulting in one or more weeks off work of at least 30% [1]. While the strategy applies to all the industrial sector, it focuses on seven key industries which includes the construction industry. The construction industry is included because it accounts for one of the highest numbers of work-related claims and reported the fourth highest incidence rate of serious claims in Australia from 2014–2018 [2].
There is a conception that risks are embedded in construction activities, and safety management competes with production [3,4], hence they are incompatible goals. This conception has resulted in the consistent emphasis by researchers that the construction industry is a high-risk industry which needs result-oriented approaches to manage construction safety [5]. Construction activities are embedded with lots of risk as workers are exposed to a wide range of job hazards, such as working at height, moving vehicles, toxic substances, and confined spaces. The hazards related to a construction project are mostly unpredictable because construction projects move quickly due to project deadlines, and changing work environments, so it is not always easy to maintain a safe and stable working environment [6]. These changes in the work schedule and pressure to meet deadlines makes the industry complex, and the complexity is one thing they have in common with high reliability organisations (HROs) [5].
Reliability seeking organisations such as construction, oil and gas, health care, and manufacturing are confronted with the problem of which attributes of HRO can be transferred and measured to improve organisational safety management. The present research has either focused on literature reviews of HRO applicability in various organisations [7,8,9], while others have conducted empirical studies to test and validate measurement instruments, and investigate conceptual frameworks [10,11,12,13,14,15,16,17]. A few measurement instruments have become available in the last few years, with most of them being developed and validated in the health care sector, based on Weick’s and Sutcliffe’s [18] principles of collective mindfulness. Other studies conducted have proposed frameworks that can be used for pain management in healthcare [19], identified the presence and application of HRO in the oil and gas industry, construction, crowd management, business school, and disaster prevention [12,14,16,17]. However, only three studies have empirically investigated HRO in the construction industry [4,17]. The first study by Hoyland et al. [17] identified the presence of HRO safety principles in the health care sector and construction industry in Norway. The study used semi-structured interviews for data collection on a small sample size of eight participants. The study had some limitations such as, the small sample size and the participants for the construction industry study were apprentices and young workers with limited work experience [17]. The second study by Mitropoulos and Cupido [4] investigated the practices of high-reliability crews (HRC) contracted to carry out framing work in the residential construction industry. The study revealed that the HRCs, in comparison with an average-performing crew, had a strong and clear guiding principle and a set of strategies that focused on preventing errors and rework [4,20]. The third study [21] was conducted in Australia across six organisations, including the construction industry and measured mindfulness of work health and safety in the workplace. The findings from the study suggest that employers in construction, manufacturing, accommodation, and food services were more mindful of work health and safety, and both employers and employees had a high level of mindfulness towards workplace safety based on their respective job role. While the study had a large sample size, most of the respondents were from small businesses or were sole traders (self-employed), and only two principles of collective mindfulness was measured (preoccupation with failure and sensitivity to operations) [21]. Despite the advancement in research, there is the absence of empirical research that measures attributes of HRO in the construction industry and how such attributes can improve construction safety management. There is also the problem of a knowledge gap as there is no guiding framework on what aspect of HRO that can actually be beneficial in improving safety management.
HROs are known to exhibit strong commitment to safety, they have decentralised decision making within a flexible management hierarchy. They do not have the luxury of trial-and-error learning because mistakes can result in severe consequences, therefore they depend on procedures that will avoid failures [19] by combining persistent cognitive processes to manage unexpected events effectively [22]. The presence of powerful cultures of learning, openness, and accountability in HRO [9] are characteristics that makes it a viable approach to improve construction safety. Aspects of HROs have been identified by Weick and Sutcliffe, but methods to implement them are rarely available or absent [22,23,24,25,26,27,28]. The low number of HRO research is an indication that there is the need for further empirical investigation of HRO in the construction industry. In addition, research has suggested that HRO enhancing practices could be transferred to the construction industry and implemented as a safety management strategy [4,5,20].
To address the research problem, an empirical study was conducted to investigate the characteristics of HRO present in the construction industry in Australia, through the use of an integrative model. The model uses key safety management factors to measure the characteristics of HRO, and provides better understanding of how the characteristics can improve construction safety management. The paper is structured as follow. A review of HRO and its characteristics are presented, which provides the background for the development of the integrative model. Then, the methods used to empirically test the measurement instrument and model are described, followed by the results. Then, the discussion of the results, implication for construction safety management, research limitations, and conclusion are presented.

1.1. Literature Review

High reliability organisations (HROs) are known to operate in extremely hazardous environments where the potential for failure is present, and to avoid failures, they use systematic safety processes to manage complex technology. Their operations are tightly coupled (i.e., systems are closely connected and depend on each other for effective operation) as they cannot afford the luxury of learning by experimentation [22,29]. They are also able to find the balance between safety and production in their operations. In the construction industry, accidents and near misses are managed using safety management procedures such as; permit-to-work system, job safety analysis (JSA), safe work method statements (SWMS) [30], incident and near miss reporting procedures, and risk assessment. These systems of safety management in construction have some similarities with HRO characteristics, but much has not been done in terms of research to empirically identify the characteristics that can improve construction safety management.
Five key characteristics found in HROs are: preoccupation with failure, reluctance to simplify, sensitivity to operation, commitment to resilience, and deference to expertise [27].

1.1.1. Preoccupation with Failure

Preoccupation with failure involves a constant feeling of unease, even when it appears that all is well, operations are focused on the likelihood that unforeseen events can disrupt operational safety, so to prevent it, HROs engage in proactive analysis of weak signals by continuously seeking errors and lapses that have the potential to lead to the failure of the system [31]. They are able to avert failures through effective reporting of near misses and errors and implementing the lesson learnt [32].

1.1.2. Reluctance to Simplify

HROs have a mental mindset where they try to maintain thinking at a conceptual and abstract level in order to manage the unexpected by deliberately questioning assumption and received wisdom, to create a clear and understandable picture of current situations, by simplifying less and seeing more [25,31].

1.1.3. Sensitivity to Operations

This involves maintaining the ‘bigger picture’ of operations by actively seeking the views of front line staff to get accurate representation of the status of operations. Reliable information is communicated about potential human and organisational failures, and changes are implemented to prevent the accumulation of errors and escalation of events [31].

1.1.4. Commitment to Resilience

This is an organisation’s ability to effectively anticipate errors and also be able to manage the outcome and bounce back from such errors [31]. HROs are able to successfully recover from errors because of their capability to learn from past incidents [31].

1.1.5. Deference to Expertise

This is the process of allowing the most experienced people to make safety critical decisions during emergencies despite their rank in the organisational hierarchy. Afterwards, decision making reverts back to organisational hierarchy [24].

1.2. Conceptual Model (Key Safety Management Factors)

The model for this study (see Figure 1) was developed from an extensive literature review of seminal work and recent empirical studies on HRO [22,26,27,33]. Key safety management factors that are associated with the HRO characteristics were identified, and used to develop the model. The factors are: safety commitment and communication, hazard management, safe site practice, and job competence [22,25,26,28]. The factors are then linked to the characteristics of HRO they measure. Further details of the model testing and validation is provided in the Methods section. The next section describes the factors.

1.2.1. Safety Commitment and Communication

Safety is top priority in the operations of HROs, which gives them the ability to find the balance between safety and production. Their operational reliability is achieved by developing highly standardised work routines and employing competent and well-trained staff [34]. Communication is the sharing of information through a two-way process where a person listens to what others have to say and understands what it means, and the person is also listened to in return. Vital information is easier to discuss when people communicate effectively in the workplace, as it gives an opportunity to understand the perspective of others, and better decisions are made [35]. Safety commitment and communication accesses construction organisations commitment towards providing a safe working environment for their employees and contractors and the procedures they follow to communicate safety information on construction sites. This factor measures preoccupation with failure, reluctance to simplify, and sensitivity to operations.
Hypothesis 1: 
Perception of construction workers safety commitment and communication predicts characteristics of HRO in construction.

1.2.2. Hazard Management

This is an organisation’s ability to identify and be aware of hazards in the workplace both at the organisational and individual level, accidents and near misses are reported and the outcome from the investigation used as a learning point to improve hazard management and overall safety management [32]. This accesses the strategies organisations implement to improve their hazard management, and measures preoccupation with failure, sensitivity to operation, commitment to resilience, and deference to expertise.
Hypothesis 2: 
Perception of construction workers hazard management predicts characteristics of HRO in construction.

1.2.3. Safe Site Practice

Safe site practices are the procedures implemented by organisations to ensure that workers follow all safety procedures when performing their duties. This is implemented through the use of the safe work method statement and effective supervision [30]. This measures sensitivity to operation, commitment to resilience, and deference to expertise [36].
Hypothesis 3: 
Perception of construction workers safe site practice predicts characteristics of HRO in construction.

1.2.4. Job Competence

This involves the process organisations follow to ensure they employ competent and experienced workers. This is important so that they can work safely and are able to make good decisions when they face challenges. HROs have a decentralised decision process making which allows the most experienced and qualified staff to make decisions instead of leaving it or waiting for top management, especially when it relates to workplace and job safety, hierarchy is reverted to normal afterwards. Job competence measures reluctance to simplify, commitment to resilience, and deference to expertise [30].
Hypothesis 4: 
Perception of construction workers job competence predicts characteristics of HRO in construction.

2. Materials and Methods

2.1. Study Design

This study involved a cross-sectional survey of frontline managers and frontline construction workers in Newcastle, New South Wales, Australia, identified and measured the characteristics of HRO present in the construction industry. The University of Newcastle Human Research Ethics Committee granted ethical approval for the study (H-2018-0330).
The survey instrument was developed specifically for the study based on relevant HRO literature [12,14,16,22,27,34,37], and the survey included 32 questions and contained self-assessment items measured on a 5-point Likert type scale from “strongly disagree” to “strongly agree”. The survey consisted of two parts. Part one included demographic questions and was aimed at identifying (job role, years of experience in organisation, and years of experience in industry). The second part consisted of four sections that make up key safety management factors in construction. Safety commitment and communication (SCC) (11 items), hazard management (HM) (7 items), safe site practice (SSP) (7 items), and job competence (JB) (3 items). The questions for part two, Section 1, Section 2, Section 3 and Section 4 were developed using Weick and Sutcliffe’s (2001) 47-item questionnaire [25], and Youngberg’s self-assessment tool as a reference in developing questions that were specifically about characteristics of HRO [34], and the questions were revised to ensure it made sense in the construction industry context.
Section 1, Section 2, Section 3 and Section 4 consisted of questions about the aspects of construction safety management targeted at measuring HRO characteristics. Section 1 (safety commitment and communication) measured preoccupation with failure, reluctance to simplify, and sensitivity to operation. Section 2 (hazard management) measured preoccupation with failure, sensitivity to operation, commitment to resilience, and deference to expertise. Section 3 (safe site practice) measured sensitivity to operation, commitment to resilience, and deference to expertise. Section 4 (job competence) measured reluctance to simplify, commitment to resilience, and deference to expertise.
To establish face and content validity, the questions were reviewed twice and modified by an expert panel that included a safety advisor working in the construction industry and three occupational health and safety academics with HRO research experience. Subsequently, some questions were reworded based on feedback from the panel which resulted in the development of a 32-item cross-sectional survey that contained 4 demographic questions and 28 scale items.
The reliability score for the instrument was α = 0.867, according to Hair et al. [38], internal consistency for data is high when Cronbach’s alpha is more than 0.7, therefore the reliability of the scale was above the minimum criteria.

2.2. Participants and Organisation Recruitment

Purposive sampling was used to ensure that participants were able to provide specific information to address the research question, have an understanding of the topic being investigated, and also include two specific hierarchical levels within the organisation [39]. Middle managers and frontline workers were selected to capture the perception of construction workers with the minimum and extensive working experience.
Participant recruitment for the study was two phased; the first phase was for the selection of organisations, while the second phase was for participants. Organisations were contacted if they were involved in large scale commercial projects and mid-sized infrastructure projects and have been operating for a minimum of five years continually. This was done to ensure that the organisations had a structured and functional safety management system capable of managing high-risk activities, and incident investigation. For participants to be eligible for the study, they were required to have a minimum of two years working experience in the industry, be more than 18 years old, and involved in or supervise high risk construction activities (working at height, confined space, etc.). Participants involved in high risk construction activities were chosen because those activities are known to cause most accidents on construction sites [30]. Emails containing letters of invitation and an information statement were sent to 50 purposively selected construction organisations in Newcastle and the Hunter region, with follow-up phone calls and site visits. At the end of the first phase, seven construction organisations accepted to take part in the study. The second phase involved site visits to the participating organisations to meet with the gate keepers (site managers and supervisors) and potential participants to create more awareness on the research and what was required of them. Potential participants were invited to participate during subsequent site visits and through research advertisement posters placed in their workplaces.

2.3. Data Collection

Data were collected using a survey questionnaire distributed to 384 construction workers across seven organisations during toolbox meetings and safety training. Participants were provided with an information statement, survey questionnaire, and consent form, and participation was totally voluntary and anonymous. Two boxes were provided at each participating organisation for returning completed questionnaires and consent forms, which were picked up weekly by the first author throughout the duration of the survey (June 2019–December 2019). A total of 250 survey questionnaires were completed. Two-hundred and ten were correctly completed and 40 were incomplete, representing a response rate of 54.6%.

2.4. Data Analysis

Data analysis was conducted using Statistical Package for Social Sciences (SPSS) version 25 (IBM Corp., Armonk, NY, USA). Creswell [40] recommends descriptive analysis be conducted for all variables and the results presented to include means, standard deviation, and range of scores [40]. In regards to this, univariate analysis was conducted for descriptive statistics such as frequency, means, percentage, and standard deviation for the participants and organisation demographics, and all variables. The characteristics of the HRO score were calculated by summing the key safety management factors.
Exploratory factor analysis (EFA) was conducted to examine the factorial structure of the measurement instrument. This was done to ensure that items measuring the same construct would significantly load on the same factor instead of loading on other factors. EFA discovers the number of factors influencing a variable by summarising patterns of correlation between observed variables while reducing a large number of observed variables to fewer number of factors [41,42]. The Kaiser–Meyer–Olkin (KMO) measure and Bartlett’s test of sphericity were conducted to assess the suitability of the respondent data for factor analysis [43]. Principal component analysis (PCA) was conducted using the Promax rotation in IBM SPSS 25 (IBM Corp., Armonk, NY, USA)
The structural equation modelling (SEM) procedure was also used for data analysis. SEM is an efficient method for hypotheses testing of relations in observed and latent variables [44], it also performs factor analysis and path analysis simultaneously because of its ability to measure and accommodate errors of manifest variables [45]. There are two methods of SEM available to researchers to choose from, these methods are: covariance based SEM (CB-SEM) [46,47], and the partial least square SEM (PLS-SEM) [47,48]. The statistical aim of CB-SEM is to estimate model parameters that minimises the difference between the observed sample covariance matrix that is calculated before a theoretical model solution is achieved. Additionally, when the goodness of fit (GOF) is established, the model is accepted and if GOF is not established, the model is not accepted [47,49]. While the statistical aim of PLS-SEM is to maximise the variance explained in the dependent variable, with focus on optimising the prediction of the endogenous constructs and not on fit [47,50].
SEM was adopted for this study as it enables the researcher to explore characteristics of HRO in construction, test the measurement model and the integrative model proposed for this study. CB-SEM was adopted to test the measurement model for this study using confirmatory factor analysis (CFA). CFA was conducted in the computer program AMOS v25 (IBM SPSS, Chicago, IL, USA) with maximum likelihood (MLE) estimation and the covariance matrix [51]. PLS-SEM was adopted to test the proposed structural model and hypothesis. Structural model assessment was carried out in the computer program SmartPLS (v. 3.3.2) [52].

3. Results

A total of 210 correctly completed survey questionnaires were used for data analysis, representing a response rate of 54.6%. The results from the analysis are presented in two parts, part one presents descriptive statistics of demographics and summary of the survey results, part two presents the results of the exploratory factor analysis, confirmatory factor analysis, structural model assessment, and hypothesis testing.

3.1. Part 1

3.1.1. Participants Characteristics

The demographics and characteristics of the participants are presented in this section. Table 1 displays the participant’s job role and their staff type. Frontline workers were (57.6%) with various job roles illustrated in the job role section of Table 1, while (42.40%) were frontline managers whose job roles are also displayed in the job role section.
Table 2 shows the years of working experience of participants in their organisation and construction industry. Organisation experience refers to experience participants had in the organisation they were employed in when they took part in the survey. Participants were required to have a minimum of two years construction experience to participate in the survey, and 84 out of 210 had less than five years’ experience, and the remaining 126 had more than five years’ experience, therefore all 210 participants qualified to take part in the survey.

3.1.2. Organisation Characteristics

Seven construction organisations participated in the study, three were large organisations employing more than 200 staff, and four medium organisations employing 50–200 staff. Table 3 shows the type of organisation, type of project embarked upon, and the number of middle management and frontline workers that participated from each organisation.

3.1.3. Summary of Survey Scores of Respondents

The scores of the variables from the participant’s responses were calculated and to identify the factors that had the highest scores. The scores of the four variables were summed up to get the characteristics of HRO in the construction score. Summary of the results are presented in Table 4.
Safety commitment and communication scored the highest, followed by safe site practice. Frontline managers had the highest scores for all the measured factors, although the difference of the scores between both staff group was not so much. This result compares with previous studies and confirms the fact that as workers move up organisational hierarchy, their attitude towards safety increases [7,9].

3.2. Part 2

3.2.1. Exploratory Factor Analysis

Principal component analysis was conducted in SPSS 25 (IBM Corp., Armonk, NY, USA) on the 28-item questionnaire that measured characteristics of HRO on 210 construction workers. PCA was accessed for its appropriateness before commencing the analysis. The Kaiser–Meyer–Olkin (KMO) index ranges from 0 to 1, with 0.05 considered suitable for factor analysis [43]. The KMO measure was 0.77, exceeding the recommended value. The Bartlett’s test of sphericity was statistically significant (chi square value = 2702.404, p value = 0.000), which suggested that the data were suitable for factorisation. An initial unforced PCA on the key safety management items revealed nine factors with an eigenvalue greater than one from the 28 questions explaining a total variance of 69.64%. The number of extracted factors was then set to four as the study was interested in four constructs to measure characteristics of HRO. A total variance of 56.04% was explained for the four factor solution. A cut off factor of 0.40 loading was applied, variables were retained if they had a loading of ≥0.40, and a difference between loadings that exceeded 0.02 [53]. Some items were dropped (SCC4, SCC6, SCC7, SCC9, HM4, HM5, SSP5, SSP6, and SSP7) because of their low communality values and did not meet the recommend factor loading of 0.40 [54].
A final PCA with Promax rotation was conducted to assist in interpretability and achieve an optimal factor structure [41]. Interpretation of the questionnaire items was consistent with the characteristics of HRO it was designed to measure, it had strong loadings for hazard management items in factor 1, safety commitment and communication items on factor 2, safe site practice on factor 3, and job competence on factor 4. The KMO for the identified factor structure was 0.717 with a statistically significant Bartlett’s test of sphericity (chi square value = 1420.678, p value = 0.00). Factor loadings of the rotated solution are presented in Table 5. The factor structure was used for the CFA in the next step of the research.

3.2.2. Testing of the Measurement Model

Confirmatory factory analysis (CFA) was conducted in AMOSv25 (IBM SPSS, Chicago, IL, USA) with the maximum likelihood estimation and covariance matrix to test the measurement model. In assessing the fitness of a model, there are three model fit indices that are used: absolute fit (GFI, RMSEA and chi-square), incremental fit (AGFI, CFI, TLI, NFI), and parsimonious fit (Chisq/df). Goodness of fit (GFI), comparative fit index (CFI) and incremental fit index have values that range from 0 to 1, with values greater than 0.90 indicating a good fit [54]. RMSEA should be less than 0.06 and SMRM should be less than 0.08. In examining the strength of scale structure, it is recommended to consider multiple fit indices [55]. This study used CFI, RMSEA, and SMRM as measures to examine model fit. The modification indices was inspected to improve the model fit measures, as a result of the inspection six items from three factors (four from safety commitment and communication, one from hazard management, and one from safe site practice) were dropped from the CFA as they had poor loading factors. The result of the model including four factor and thirteen indicators showed excellent fit (chi-square/df = 2.124, CFI = 0.952, RMSEA = 0.073, SRMR = 0.075). All items factor loadings were statistically significant (p < 0.001) as shown in Figure 2 with standardised factor loading ranging from 0.54 to 0.97.
The convergent and discriminant validity were tested. Convergent validity is the extent to which indicators of a specific construct converge or share a high proportion of variance in common [55]. Convergent validity can be estimated through factor loadings and average variance extracted (AVE) [55,56]. AVE was used to measure the degree each construct differed from other construct in the model.
Discriminant validity is the fact that a factor is truly different from other construct. Hair et al. recommends that AVE should be greater than maximum shared variance (MSV); the square root for a factor should be bigger than inter construct correlation; and AVE should be greater than average shared variance (ASV) [56,57]. Going by the recommended thresholds as shown in Table 6, the four factors from this study do not have any convergent and discriminant validity and reliability issues.

3.2.3. Structural Model Assessment and Hypothesis Testing

Table 7 presents the means, standard deviations, and correlation coefficient for the study variables. All the variables are significantly correlated (p < 0.01).
The structural model assessment of the proposed model for this study was accessed using PLS-SEM in the computer program SmartPLS, because the main objective of the model is to predict that safety commitment and communication (SCC), hazard management (HM), safe site practice (SSP), and job competence (JC) measures characteristics of HRO in construction as hypothesised. PLS fit measures are mostly variance based and focus on the discrepancy between the observed values of the dependent variables and the values predicted by the model in question [50]. The coefficient of determination (R2 value) is the most commonly used measure to assess structural models. R2 is a measure of the model’s predictive power and is calculated as the squared correlation between a specific endogenous construct’s actual and predicted values [50]. R2 value ranges from 0 to 1, with higher levels indicating higher levels of predictive accuracy. (R2 values of 0.75, 0.50, or 0.25 for endogenous latent variables are described as substantial, moderate, or weak) [58].
The path coefficient and p values are also used in structural model assessment. The path coefficient represents the hypothesized relationship between the constructs, with standardized values approximately between −1 and +1. Path coefficients close to +1 indicate strong positive relationships [50]. The T-statistics is used to establish the significant of direct effect and relationship, T is significant when the T-value is greater than 1.96 [58].
The structural model assessment diagram is shown in Figure 3 and the assessment statistics in Table 8 and Table 9.
The structural model assessment revealed that the model had a high predictive power as R2 = 0.84, and there is a significant relationship and direct positive effect between SCC, HM, SSP, JC, and CH (p = 0.000). Additionally, R2 is above the recommended substantial threshold of 0.75 [58] and all T-statistics are larger than 1.96.
The hypothesis testing result is presented in the next paragraph.
Hypothesis 1 proposed that perception of construction workers safety commitment and communication (SCC) predicts characteristics of HRO in construction (CHC), which is supported by the findings of this study. There was a significant positive direct effect of safety commitment and communication (SCC) on characteristics of HRO in construction (CHC). Therefore, hypothesis 1 was supported.
Hypothesis 2 proposed that perception of construction workers hazard management (HM) predicts characteristics of HRO in construction (CHC), which is supported by the findings of this study. There was a significant positive direct effect of hazard management (HM) on characteristics of HRO in construction (CHC). Therefore, hypothesis 2 was supported.
Hypothesis 3 proposed that perception of construction workers safe site practice (SSP) predicts characteristics of HRO in construction (CHC), which is supported by the findings in this study. There was a significant positive direct effect of safe site practice (SSP) on characteristics of HRO in construction (CHC). Therefore, hypothesis 3 was supported.
Hypothesis 4 proposed that perception of construction workers job competence (JC) predicts characteristics of HRO in construction (CHC), which is supported in this study. There was a significant positive direct effect of job competence (JC) on characteristics of HRO in construction (CHC). Therefore, hypothesis 4 was supported.
The hypothesis has significantly proven that safety commitment and communication, hazard management, safe site practice, and job competence can measure and predict the characteristics of HRO in the construction industry.

4. Discussion

The aim of this study was to investigate how key safety management factors can be used to measure the characteristics of HRO in the construction industry in New South Wales Australia. Previous research by Harvey et al. [5] identified the barriers of transferring HRO utility to construction industry, they argued that according to normal accident theory, construction is not seen as a high risk industry despite the continuous growth in complex projects, but also suggested that today’s construction projects are more complex than what they use to be, indicating an opportunity to reconceptualise ‘high risk’ industries. In line with this, recent research have started exploring avenues to transfer HROs concepts to construction industry [17], and this study is one of such.
The findings of this study have empirically identified safety commitment and communication, hazard management, safe site practice, job competence as constructs that can effectively measure the characteristics of HRO. While previous studies conducted in the construction industry have been mostly qualitative [17]. This study addresses that gap by validating a measurement instrument and testing a model in the construction industry.
Safety commitment and communication accounts for an important aspect of safety management in every construction organisation, as it is very vital to provide a safe working environment. This usually involves the implementation of procedures and strategies to keep the working environment safe. Safety information is usually provided by management to workers via a two way communication of giving and receiving of information on work related hazards and risk controls. Safety commitment and communication was found to have a significant direct positive effect with CHC and can also measure and predict CHC. The statistical significance of SCC empirically identifies the presence of preoccupation with failure, reluctance to simplify, and sensitivity to operations.
Hazard management had a strong significant positive direct effect on CHC with a path coefficient of (0.415) from the structural model assessment, and high standardised estimates (β = 0.61, 0.65, 0.81, 0.83) on the measurement model. This finding indicates that construction organisations are committed to the management of workplace safety, and it can also be compared with the mindfulness study in Australia that identified construction workers as being more mindful of workplace health and safety based on their job role [13]. The findings can be attributed to the fact that construction activities are carefully planned and executed because of the risk involved, and the likelihood of workers being harmed from accidents as a result of unsafe act or unsafe working conditions. Therefore, to effectively manage safety, the industry makes use of risk assessment, hazard identification, supervision, and inspection to identify unsafe working conditions, work related hazards, and encourage workers to report safety concerns, incidents, and near misses. Hazard management direct positive significance identifies and measures preoccupation with failure, sensitivity to operation, commitment to resilience, and deference to expertise.
Safe site practice had the strongest significance and direct positive effect both for the hypothesis testing and instrument testing (standardized β = 0.54, 0.94, 0.97), and the highest T-statistics with a value of (13.07). Safe site practice involves more frontline managers as it has to with supervision and ensuring all safety procedures are followed. SSP identified and measured sensitivity to operation, commitment to resilience, and deference to expertise.
Job competence also had a significant positive direct effect on CHC though with the lowest path coefficient and T-statistics (0.048, 4.376) but had a relative high standardised estimate (standardized β = 0.73, 0.87, 0.93), and least mean score. This is mostly handled by management, as it involves ensuring workers have the right skills and experience to do their jobs. This measured reluctance to simplify, commitment to resilience and deference to expertise.
Research by Hoyland et al. [17] identified sensitivity to operation and commitment to resilience as the most prevalent HRO safety principle present in the construction industry in Norway, while deference to expertise was the least prevalent. The results from this study also identified deference to expertise as the least measured HRO characteristics under job competence, while sensitivity to operation, preoccupation with failure were the most measured under safety commitment and communication, hazard management, and safe site practice.
The results from the hypothesis testing have provided statistically significant evidence that characteristics of HRO can be measured in the construction industry through safety commitment and communication, hazard management, safe site practice, and job competence. The factor analysis also provided evidence that factors measure the characteristics of HRO, as this was further proven by the CFA, and all the variables were correlated. The measurement instrument had a good model fit with excellent goodness of fit (GFI), and the structural model had an above substantial R2 value (0.848). This study has empirically identified SCC, HM, SSP, and JC as constructs that measure and predict the characteristics of HRO (preoccupation with failure, reluctance to simplify, sensitivity to operation, commitment to resilience, and deference to expertise) present in the construction industry in Australia.

4.1. Implication for Construction Safety Management

Applying the aspects of HRO to other organisations has been a major challenge as some have argued that such can only be applied in extremely hazardous organisations, where their operations are tightly coupled [5]. Over the years, the construction industry has evolved and has become more complex with some similarities to HRO. However, despite the similarities, the industry struggles to find the balance between safety and production performances, making it difficult to avoid accidents, and achieve nearly error free operations. The findings from this paper have two practical implications for improving construction safety management.
The first implication is the identification and measurement of HRO characteristics present in the construction industry through the validation of a measuring instrument and testing a model that predicts characteristics of HRO. This evidence signifies the possibility of applying and transferring HRO attributes to the construction industry.
The second implication is that construction organisations can use the constructs (SCC, HM, SSP, and JC) that measure HRO characteristics to improve safety management as they have become more complex due to the increase in demand for commercial and residential buildings. This complexity is as a result of using advanced technology, machines, and subcontractors to meet demands and deadlines [59]. Construction organisations should ensure all relevant and safety critical information is effectively communicated to the people doing the job. Incident and near miss reporting should be encouraged as such information offers opportunity for learning and improvement; this can be achieved by establishing effective communication procedures and a strong learning culture. Construction sites are known to constantly change due to design alteration, weather conditions, or pressure to meet project deadlines, therefore organisations should not get complacent and allow safety to compete with production performance, rather they should be committed to putting safety first in their activities, learning from past events to improve safety performance, have a flexible decision making approach that values expertise and experience over rank, while effectively communicating safety information across the board.

4.2. Research Limitations

This study identified and measured characteristics of HRO present in the construction industry in New South Wales Australia, but there are some empirical limitations to be considered and followed up with future research. The study focused on a small number of construction organisations in a particular region in Australia, this was due to the fact that most construction organisations declined to allow their staff to take part in the study, so the results may not be generalizable. This research is a step in the right direction and a foundation for other research to build on. Additionally, the results can be used as a strategy to improve safety management of some high risk and general construction activities. Future research should focus of replicating studies like this with a broader population of construction organisations, so that the results can be compared and generalized.

5. Conclusions

The aim of this research was to provide empirical evidence on the measurement of the characteristics of HRO in the construction industry in New South Wales, Australia. From the analysis, safety commitment and communication, hazard management, safe site practice, and job competence were identified as constructs that measure the characteristics of HRO present in the system of work in the construction industry in Australia. The findings also present evidence that worker perception towards workplace safety increases as they move up the organisational hierarchy. This was evident in the domain scores as frontline managers had higher scores compared to frontline workers. The findings from this research will help facilitate knowledge transfer from HROs to contemporary high risk organisations such as construction, and also help improve construction safety management.

Author Contributions

Study design and framework, A.E.; data analysis and writing of original draft A.E. Writing—review A.E., M.P. and S.D.; supervision and general oversight: M.P., S.D. All authors have read and agreed to the published version of the manuscript.

Funding

This research was completed as part of the first author’s Ph.D. research and is funded by the University of Newcastle International Postgraduate Scholarship (UNIPRS) and University of Newcastle Research Scholarship Central 50:50 (UNRSC5050).

Acknowledgments

The authors wish to thank the organisations and participants that took part in the data collection of this study.

Conflicts of Interest

The authors declare no conflict of interest.

References

  1. SWA. Australian Work Health and Safety Strategy 2012–2022; Safe Work Australia: Canberra, Australia, 2012. [Google Scholar]
  2. SWA. Fatality Statistics by Industry; Safe Work Australia: Canberra, Australia, 2020. [Google Scholar]
  3. Swuste, P.; Frijters, A.; Guldenmund, F. Is it possible to influence safety in the building sector? A literature review extending from 1980 until the present. Saf. Sci. 2012, 50, 1333–1343. [Google Scholar] [CrossRef]
  4. Mitropoulos, P.; Cupido, G. Safety as an emergent property: Investigation into the work practices of high-reliability framing crews. J. Constr. Eng. Manag. 2009, 135, 407–415. [Google Scholar] [CrossRef]
  5. Harvey, E.J.W.; Dainty, P.; Dainty, A.R.J. Applying HRO and resilience engineering to construction: Barriers and opportunities. Saf. Sci. 2016, 117, 523–533. [Google Scholar] [CrossRef] [Green Version]
  6. Mroszczyk, J.W. Improving construction safety: A team effort. Prof. Saf. 2015, 60, 55–68. [Google Scholar]
  7. Enya, A.; Pillay, M.; Dempsey, S. A systematic review on high reliability organisational theory as a safety management strategy in construction. Safety 2018, 4, 6. [Google Scholar] [CrossRef] [Green Version]
  8. Dierynck, B.; Leroy, H.; Savage, G.T.; Choi, E. The Role of Individual and Collective Mindfulness in Promoting Occupational Safety in Health Care. Med. Care Res. Rev. 2017, 74, 79–96. [Google Scholar] [CrossRef] [PubMed]
  9. Tolk, J.N.; Cantu, J.; Beruvides, M. High reliability organization research: A literature review for health care. Eng. Manag. J. 2015, 27, 218–237. [Google Scholar] [CrossRef]
  10. Vogus, T.J.; Welbourne, T.M. Structuring for high reliability: HR practices and mindful processes in reliability-seeking organizations. J. Organ. Behav. 2003, 24, 877–903. [Google Scholar] [CrossRef] [Green Version]
  11. Thomassen, O.; Espelandl, A.; Søfteland, E.; Lossius, H.M.; Heltne, J.K.; Brattebø, G. Implementation of checklists in health care; Learning from high-reliability organisations. Resusc. Emerg. Med. 2011, 19, 53. [Google Scholar] [CrossRef] [Green Version]
  12. Ray, J.L.; Baker, L.T.; Plowman, D.A. Organizational mindfulness in business schools. Acad. Manag. Learn. Educ. 2011, 10, 188–203. [Google Scholar]
  13. Mousavi, S.M.H.; Behrouz, M.J.; Zerati, H.; Dargahi, H.; Asadollahi, A.; Mousavi, S.A.; Ashrafi, E.; Aliyari, A. Assessment of high reliability organizations model in Farabi Eye Hospital. Iran J. Public Health 2018, 47, 77–85. [Google Scholar]
  14. Lekka, C.; Sugden, C. The successes and challenges of implementing high reliability principles: A case study of a UK oil refinery. Proc. Saf. Environ. Prot. 2011, 89, 443–451. [Google Scholar] [CrossRef]
  15. Klockner, K. Strategically developing a resilient safety culture: Organizational mindfulness and mindful organizing. In Proceedings of the International Conference on Applied Human Factors and Ergonomics, Los Angeles, CA, USA, 17–21 July 2017; Springer: Berlin/Heidelberg, Germany.
  16. Agwu, A.E.; Labib, A.; Hadleigh-Dunn, S. Disaster prevention through a harmonized framework for high reliability organisations. Saf. Sci. 2019, 111, 298–312. [Google Scholar] [CrossRef] [Green Version]
  17. Hoyland, S.A.; Skotnes, R.; Holte, K.A. An empirical exploration of the presence of HRO safety principles across the health care sector and construction industry in Norway. Saf. Sci. 2018, 107, 161–172. [Google Scholar] [CrossRef]
  18. Weick, K.E.; Sutcliffe, K. Organizing for high reliability: Processes of collective mindfulness. In Research in Organizational Behavior: Volume 1; Elsevier: New York, NY, USA, 1999; pp. 81–123. [Google Scholar]
  19. Samuels, J.G. The application of high-reliability theory to promote pain management. J. Nurs. Admin. 2010, 40, 471–476. [Google Scholar] [CrossRef] [Green Version]
  20. Pillay, M. Progressing zero harm: A review of theory and applications for advancing health and safety management in construction. In Proceedings of the CIB W099 International Health and Safety Conference, Achieving Sustainable Construction Health and Safety, Lund, Sweden, 2–3 June 2014. [Google Scholar]
  21. SW. Mindfulness of Work Health and Safety in the Workplace; Safe Work: Canberra, Australia, 2015. [Google Scholar]
  22. Weick, K.E.S.; Sutcliffe, K.M.; Obstfeld, D. Organizing for high reliability: Processes of collective mindfulness. Crisis Manag. 2008, 3, 81–123. [Google Scholar]
  23. Roberts, H. Cultural characteristics of reliability enhancing organisations. J. Manag. Issues 1993, 5, 162–181. [Google Scholar]
  24. Hales, D.N.C.; Satya, S. Creating high reliability organizations using mindfulness. J. Bus. Res. 2016, 69, 2873–2881. [Google Scholar] [CrossRef]
  25. Weick, K.; Sutcliffe, K.M. Managing the Unexpected—Assuring High Performance in an Age of Complexity; Jossey-Bass: San Francisco, CA, USA, 2001. [Google Scholar]
  26. Weick, K.; Sutcliffe, K.M. Managing the Unexpected: Resilient Performance in an Age of Uncertainty; John Wiley & Sons Inc.: New York, NY, USA, 2007. [Google Scholar]
  27. Weick, K.; Sutcliffe, K.M. Managing the Unexpected: Sustained Performance in a Complex World; John Wiley & Sons: Hoboken, NJ, USA, 2015. [Google Scholar]
  28. Weick, K.E.S.; Sutcliffe, K.M. Managing the Unexpected: Resilient Performance in an Age of Uncertainty; John Wiley & Sons: New York, NY, USA, 2011. [Google Scholar]
  29. Rochlin, G. Defining high reliability organizations in practice: A taxonomic prolologue. In New Challenges to Understanding Organizations; Roberts, K.H., Ed.; Macmilan: New York, NY, USA, 1993; pp. 11–32. [Google Scholar]
  30. Borys, D. The role of safe work method statements in the Australian construction industry. Saf. Sci. 2012, 50, 210–220. [Google Scholar] [CrossRef] [Green Version]
  31. Sutcliffe, K.M. High reliability organizations (HROs). Clin. Anaest. 2011, 25, 133–144. [Google Scholar] [CrossRef]
  32. Hopkins, A. The Problem of Defining High Reliability Organisations; ANU College of Asia and the Pacific: Canberra, Australia, 2007; Available online: http://regnet.anu.edu.au/research/publications/3041/wp-51-problem-defining-high-reliability-organisations (accessed on 14 May 2017).
  33. Vogus, T.J.; Sutcliffe, K.M. Organizational mindfulness and mindful organizing: A reconciliation and path forward. Acad. Manag. Learn. Educ. 2012, 11, 722–735. [Google Scholar] [CrossRef] [Green Version]
  34. Youngberg, B.J. Assessing your organization’s potential to become a high reliability organization. J. Healthc. Risk Manag. 2004, 24, 13–19. [Google Scholar] [CrossRef]
  35. Vecchio-Sadus, A.M. Enhancing safety culture through effective communication. Saf. Sci. Monitor. 2007, 11, 1–10. [Google Scholar]
  36. Saunders, F.C. Toward high reliability project organizing in safety-critical projects. Proj. Manag. J. 2015, 46, 25–35. [Google Scholar] [CrossRef]
  37. La Porte, T.R. High reliability organizations: Unlikely, demanding and at risk. J. Conting.Crisis Manag. 1996, 4, 60–71. [Google Scholar] [CrossRef]
  38. Hair, J.F.T.; Tatham, R.L.; Anderson, R.E.; William, B.C. Multivariate Data Analysis, 5th ed.; Prentice Hall: Upper Saddle River, NJ, USA, 1998. [Google Scholar]
  39. Patton, M.Q. Qualitative Evolution and Research Methods, 2nd ed.; Sage: Newbury Park, CA, USA, 1990. [Google Scholar]
  40. Creswell, J.W. Research Design: Qualitative, Quantitative, and Mixed Method Approaches, 4th ed.; Sage Publications: Thousand Oaks, CA, USA, 2014. [Google Scholar]
  41. Yong, A.G.; Pearce, S.A. Beginner’s guide to factor analysis: Focusing on exploratory factor analysis. Quant. Methods Psychol. 2013, 9, 79–94. [Google Scholar] [CrossRef]
  42. Tabachnick, B.G.; Fidell, L.S. Using Multivariate Statistics, 6th ed.; Pearson: New York, NY, USA, 2013. [Google Scholar]
  43. Williams, B.; Onsman, A.; Brown, T. Exploratory factor analysis: A five-step guide for novices. Austra. J. Paramed. 2010, 8. [Google Scholar] [CrossRef] [Green Version]
  44. Hair, J.F., Jr.; Sarstedt, M.; Hopkins, L.; Volker, G.K. Partial least squares structural equation modeling (PLS-SEM). Eur. Bus. Rev. 2014, 26, 106–121. [Google Scholar] [CrossRef]
  45. Xiong, B.; Skitmore, M.; Xia, B. A critical review of structural equation modeling applications in construction research. Autom. Constr. 2015, 49, 59–70. [Google Scholar] [CrossRef] [Green Version]
  46. Jöreskog, K.G. Testing Structural Equation Models; Sage Focus Editions: Thousand Oaks, CA, USA, 1993; Volume 154, p. 294. [Google Scholar]
  47. Matthews, L.; Hair, J.; Matthews, R. Pls-Sem: The holy grail for advanced analysis. Mark. Manag. J. 2018, 28, 1–13. [Google Scholar]
  48. Lohmöller, J.-B. Predictive vs. Structural Modeling: Pls vs. ml. In Latent Variable Path Modeling with Partial Least Squares; Springer: Berlin/Heidelberg, Germany, 1989; pp. 199–226. [Google Scholar]
  49. Hair, J.F.; Sarstedt, M.; Ringle, C.M.; Mena, J.A. An assessment of the use of partial least squares structural equation modeling in marketing research. J. Acad. Mark. Sci. 2012, 40, 414–433. [Google Scholar] [CrossRef]
  50. Hair, J.F.; Sarstedt, M.; Pieper, T.M.; Ringle, C.M. The use of partial least squares structural equation modeling in strategic management research: A review of past practices and recommendations for future applications. Long Range Plan. 2012, 45, 320–340. [Google Scholar] [CrossRef]
  51. Kline, R.B. Principles and Practice of Structural Equation Modeling; Little, T.D., Ed.; The Guilford Press: New York, NY, USA, 2011. [Google Scholar]
  52. Ringle, C.M.; Wende, S.; Becker, J.-M. SmartPLS 3; SmartPLS GmbH: Boenningstedt, Germany, 2015. [Google Scholar]
  53. Nunnally, J.C.; Bernstein, I.H. Psychometric Theory; McGraw-Hill: New York, NY, USA, 1994. [Google Scholar]
  54. Wang, L.; Fan, X.; Willson, V.L. Effects of nonnormal data on parameter estimates and fit indices for a model with latent and manifest variables: An empirical study. Struct. Equ. Modeling Multidiscip. J. 1996, 3, 228–247. [Google Scholar] [CrossRef]
  55. Hair, J.F.; Gabriel, M.; Patel, V. AMOS covariance-based structural equation modeling (CB-SEM): Guidelines on its application as a marketing research tool. Braz. J. Mark. 2014, 13, 44–55. [Google Scholar]
  56. Guo, B.H.W.; Yiu, T.W.; González, V.A. Predicting safety behavior in the construction industry: Development and test of an integrative model. Saf. Sci. 2016, 84, 1–11. [Google Scholar] [CrossRef]
  57. Hair, J.; Black, W.; Babin, B.; Anderson, R. Multivariate Data Analysis, 7th ed.; Prentice Hall, Inc.: Upper Saddle River, NJ, USA, 2010. [Google Scholar]
  58. Hair, J.F.; Hult, G.T.M.; Ringle, C.M.; Sarstedt, M. A Primer on Partial Least Squares Structural Equation Modeling (PLS-SEM); Sage: Thousand Oaks, CA, USA, 2017. [Google Scholar]
  59. Victoria, W. Incidents and Prosecution. 13 December 2018. Available online: http://www.worksafenews.com.au/news/itemlist/category/4-incidents-prosecutions.html (accessed on 13 December 2019).
Figure 1. The proposed model to identify and measure characteristics of High Reliability Organisations (HROs) present in construction.
Figure 1. The proposed model to identify and measure characteristics of High Reliability Organisations (HROs) present in construction.
Ijerph 17 08273 g001
Figure 2. Standardised estimates for the 13-item four-factor structure.
Figure 2. Standardised estimates for the 13-item four-factor structure.
Ijerph 17 08273 g002
Figure 3. Structural model predicting Characteristics of HRO in Construction (CHC) (SCC—safety commitment and communication, HM—hazard management, SSP—safe site practice, JC—job competence).
Figure 3. Structural model predicting Characteristics of HRO in Construction (CHC) (SCC—safety commitment and communication, HM—hazard management, SSP—safe site practice, JC—job competence).
Ijerph 17 08273 g003
Table 1. Participants by job role and staff type.
Table 1. Participants by job role and staff type.
Job Roleƒ%
Frontline Managers
Safety Officer 167.60
Site Supervisor5928.10
Foreman146.70
Frontline Workers
Metal worker52.40
Welder157.10
Scaffolder73.30
Carpenter3215.20
Plant operator41.90
Painter21.00
Plumber146.70
Plasterer125.70
Demolition worker41.90
Joiner2612.40
Total210100.00
Staff Typeƒ%
Middle Management8942.40
Frontline workers12157.60
Table 2. Participants by industry and organisation experience.
Table 2. Participants by industry and organisation experience.
Years of ExperienceIn OrganisationIn Construction
ƒ%ƒ%
<5 years10751.008440.00
5–10 years8038.106832.40
11–15 years146.703516.70
16–20 years31.4083.80
>20 years62.90157.10
Total210100.00210100.00
Table 3. Participants by organisation and staff type.
Table 3. Participants by organisation and staff type.
Organisations/TypeType of ProjectMiddle ManagementFrontlineTotal
Organisation 1 (Large)High rise commercial buildings182846
Organisation 2 (Large)Multiple blocks of residential buildings162036
Organisation 3 (Large)Community shopping mall172340
Organisation 4 (Medium)New Residential buildings91221
Organisation 5 (Medium)Renovation of office buildings101323
Organisation 6 (Medium)New Residential buildings91120
Organisation 7 (Medium)New residential buildings101424
Total89121210
Table 4. Summary of survey scores.
Table 4. Summary of survey scores.
Variable ScoresStaff GroupMeanPercent (%)
Safety Commitment and Communication (SCC)Frontline managers47.6944.4
Frontline workers 43.9355.6
Hazard Management (HM)Frontline managers28.9743.8
Frontline workers27.3756.2
Safe Site Practice (SSP)Frontline managers30.0843.7
Frontline workers28.5256.3
Job Competence (JC)Frontline managers12.2943.6
Frontline workers11.6856.4
Characteristics of HRO in Construction Scores (SCC + HM + SSP + JC)Frontline managers119.0544.0
Frontline workers111.5156.0
Table 5. Rotated structure matrix for Principal Component Analysis (PCA) with Promax rotation for safety management constructs.
Table 5. Rotated structure matrix for Principal Component Analysis (PCA) with Promax rotation for safety management constructs.
ScaleComponents
1234
SCC1 0.715
SCC2 0.725
SCC3 0.705
SCC5 0.640
SCC8 0.413
SCC10 0.493
SCC11 0.543
HM10.848
HM20.883
HM30.863
HM60.514
HM70.532
SSP1 0.907
SSP2 0.884
SSP3 0.706
SSP4 0.662
JC1 0.447
JC2 0.960
JC3 0.946
% Variance accounted for27.63810.3289.2018.873
Cumulative variance27.63837.96747.16856.040
Extraction method is principal component analysis, rotation method; Promax with Kaiser normalization. Factor loadings greater than 0.40 are in bold.
Table 6. Convergent and discriminant validity of factors.
Table 6. Convergent and discriminant validity of factors.
ScaleCRAVEMSVMaxR(H)Safety_CCJob_CSafe_SPHazard_M
Safety_CC0.7840.5490.1570.8000.741
Job_C0.8850.7220.1000.9170.3170.850
Safe_SP0.8730.7070.1260.9590.2760.2690.841
Hazard_M0.8200.5370.1570.8460.3960.2660.355 0.733
Table 7. Descriptive statistics and correlation among variables.
Table 7. Descriptive statistics and correlation among variables.
ScaleMSDSCCHMSSPJCCHC
SCC3.5720.18210.341 **0.332 **0.283 **0.696 **
HM4.0060.2420.341 **10.335 **0.211 **0.786 **
SSP3.5850.1740.332 **0.335 **10.252 **0.684 **
JC3.4930.1360.283 **0.211 **0.252 **10.538 **
CHC7.3340.2580.696 **0.786 **0.684 **0.538 **1
SCC: safety commitment and communication, HM: hazard management, SSP: safe site practice, JC: job competence, CHC: characteristics of HRO., M = mean, S = standard deviation. ** Correlation is significant at 0.01 level.
Table 8. Structural model assessment.
Table 8. Structural model assessment.
HypothesisRelationship 95% CI
Direct EffectPath Coef.St. Dev.T-Statisticsp-ValuesLowerUpperDecision
H1SCC -> CHC0.3280.0447.4840.0000.2290.401Supported
H2HM -> CHC0.4150.03412.3250.0000.3460.479Supported
H3SSP -> CHC0.3520.02713.0780.0000.3000.406Supported
H4JC -> CHC0.2090.0484.3760.0000.1020.282Supported
Table 9. R2 Statistics.
Table 9. R2 Statistics.
FactorPath CoefSt. Dev.T-Statisticsp-ValuesLowerUpper
CHC0.8480.05914.4350.0000.7200.953
Publisher’s Note: MDPI stays neutral with regard to jurisdictional claims in published maps and institutional affiliations.

Share and Cite

MDPI and ACS Style

Enya, A.; Dempsey, S.; Pillay, M. A Study Investigating How the Characteristics of High Reliability Organisations Can Be Measured in the Construction Industry in Australia. Int. J. Environ. Res. Public Health 2020, 17, 8273. https://0-doi-org.brum.beds.ac.uk/10.3390/ijerph17218273

AMA Style

Enya A, Dempsey S, Pillay M. A Study Investigating How the Characteristics of High Reliability Organisations Can Be Measured in the Construction Industry in Australia. International Journal of Environmental Research and Public Health. 2020; 17(21):8273. https://0-doi-org.brum.beds.ac.uk/10.3390/ijerph17218273

Chicago/Turabian Style

Enya, Andrew, Shane Dempsey, and Manikam Pillay. 2020. "A Study Investigating How the Characteristics of High Reliability Organisations Can Be Measured in the Construction Industry in Australia" International Journal of Environmental Research and Public Health 17, no. 21: 8273. https://0-doi-org.brum.beds.ac.uk/10.3390/ijerph17218273

Note that from the first issue of 2016, this journal uses article numbers instead of page numbers. See further details here.

Article Metrics

Back to TopTop