p.1221
p.1225
p.1231
p.1243
p.1248
p.1252
p.1256
p.1261
p.1266
Ultimate Bearing Capacity Analysis of Concrete Filled Steel Tubular Arch Considering the Initial Defects’ Influence
Abstract:
In the CFST arch bridge construction process, for the reasons of arch axis deviation as prefabricated or constructed, the bearing capacity of arch-rib decreased. This paper considers material and geometric non-linear double factors, calculates the arch-rib ultimate bearing capacity of a CFST arch/continuous beam bridge with defects of arch axis deviation and steel yield stress decrease because of heat treatment, obtain the influence of defects to arch bearing capacity.
Info:
Periodical:
Pages:
1248-1251
Citation:
Online since:
January 2012
Authors:
Price:
Permissions: