Next Article in Journal
Impact of High-Speed Rail on Social Equity—Insights from a Stated Preference Survey in Vietnam
Next Article in Special Issue
China’s New Silk Road and Central and Eastern Europe—A Systematic Literature Review
Previous Article in Journal
Proactive Corporate Sustainability via Social Innovation—A Case Study of the Hennes & Mauritz Grand Challenge in Bangladesh
Previous Article in Special Issue
Official Tenure, Fiscal Capacity, and PPP Withdrawal of Local Governments: Evidence from China’s PPP Project Platform
 
 
Font Type:
Arial Georgia Verdana
Font Size:
Aa Aa Aa
Line Spacing:
Column Width:
Background:
Article

Measuring Project Governance of Mega Infrastructure in China: A Scale Development Study

1
School of Civil Engineering and Architecture, Nanchang University, Nanchang 330031, China
2
Faculty of Civil Engineering and Mechanics, Kunming University of Science and Technology, Kunming 650032, China
3
General Manager Office, Shanghai K&Z Construction Project Management Co., Ltd., Shanghai 200092, China
*
Author to whom correspondence should be addressed.
Sustainability 2022, 14(2), 593; https://0-doi-org.brum.beds.ac.uk/10.3390/su14020593
Submission received: 15 September 2021 / Revised: 22 December 2021 / Accepted: 24 December 2021 / Published: 6 January 2022
(This article belongs to the Special Issue Managing Sustainable Megaprojects along China's New Silk Roads)

Abstract

:
This study builds a measurement framework of project governance for mega-infrastructure considering the institutional situation of mega-infrastructure projects in China, including contractual governance, relational governance, and governmental governance. The factors of governmental governance are identified by the method of grounded theory with six cases of megaprojects, and the measures of project governance for mega-infrastructure are refined by expert interviews. The 235 questionnaires are collected, and exploratory factor analysis is used to identify six factors of the governance mechanism for mega-infrastructure projects. The scales are developed, and reliability and validity tests are conducted. Results indicate that (1) the governmental governance mechanism includes government decision, government supervision, and government coordination. (2) The three-dimensional framework of project governance is established as “contractual–relational–governmental” in the field of mega-infrastructure. (3) The measurement scales of project governance are developed and validated for mega-infrastructure, including government regulation, government coordination, risk sharing, revenue distribution, relationship maintenance, and cultural development. This research contributes to (a) the state of the knowledge by gaining a holistic and comprehensive understanding of project governance in mega-infrastructure in China, and (b) the state of the practice by providing a tool for measuring project governance in mega-infrastructure.

1. Introduction

The world has entered the “Trillion Era” of mega-infrastructure projects [1,2]. According to a report of global consulting by McKinsey, the total investment in infrastructures would reach up to 57 trillion by 2030 [3]. Flyvbjerg (2014) also estimated that the global annual investment in mega-infrastructure projects would reach up to 6–9 trillion dollars [2], accounting for 8% of the global Gross Domestic Product (GDP). In 2013, Chinese President Xi Jinping announced that he wanted to resurrect the legendary Silk Road; he proposed a titanic project to build hundreds of roads, bridges, and railroads to connect China and Europe. In China, the government also speaks of the “Belt and Road initiative” (One Belt, One Road—abbreviated OBOR) to describe the project that will span more than 50 years [4]. The implementation of “One Belt, One Road” initiated by the Chinese government had set off a new round of investment climax in construction projects [5]. Mega-infrastructure projects have the characteristics of large scale, complex technology, and extensive profound meaning, compared with general projects [5]. It brings a huge challenge for decision making and project management, and the “over investment, over schedule and low investment profit” has become an international “iron law” in mega-infrastructure projects [6,7].
Project governance (PG) has a significant role in the implementation of projects and has been regarded as a decisive factor affecting project performance [6,8]. Compared with project management, project governance is a higher level of management activities which is called “management of project management” [9,10]. It helps to reduce the risks throughout the life cycle by coordinating project stakeholders. Numerous researches have been conducted on project governance, especially the framework of project governance. For instance, Brunet (2019) advanced a conceptualization for governance-as-practice [11]. Müller et al. developed a framework for the governance of projects based on eight case studies [12]. Too and Weaver offer a framework to build on current theory development and practice by synthesizing the existing literature [13]. It can be concluded that the research methods are based on the qualitative analysis but lack the qualitative–quantitative analysis of the model, and even less the cross-case analysis and empirical research. Besides, existing research reaches a consensus that project governance mechanisms mainly include contractual governance (CG) and relational governance (RG) [14,15,16].
However, mega-infrastructure projects have a government-led institutional context in China, compared to common projects [6,7]. The government is a leading force to promote the construction of mega-infrastructure projects in China with the help of a unique institution [7]. The leading group or headquarters are adopted for mega-infrastructure projects and make a series of remarkable achievements. Because most mega-infrastructure projects are directly managed by central or local government departments or authorized branches (such as headquarters, management committee, and government-funded project companies, etc.) [17], it has a special situation of “vertical governance” in mega-infrastructure projects in China [7]. The governance mechanism of administrative instructions from the government is defined as “governmental governance (GG)” in this study [18,19].
Therefore, it is of great theoretical and practical significance to explore governance mechanisms of mega-infrastructure projects in China in the context of “One Belt and One Road”. The main objective is to answer the following research questions: (i) How do we measure the governmental governance suited to the institutional situation in China? (ii) How do we measure multidimensional governance mechanisms of megaprojects in China? To address the research questions, sequential qualitative–quantitative research is conducted in this study to develop and validate the scale to measure project governance in mega-infrastructure. This research contributes to (a) the state of the knowledge by gaining a holistic and comprehensive understanding of project governance in mega-infrastructure in China, and (b) the state of the practice by providing a tool for measuring the project governance in mega-infrastructure.

2. Literature Review

Governance is from the Latin word “gubernare”, meaning “guidance”, and mainly refers to the guidance of the country. Project governance is proposed by Turner and Keegan, who introduced the theory of governance into the field of project management by referring to corporate governance [20]. Regarding the project governance mechanism, existing authors classified project governance into different dimensions [21]. For instance, Chen and Manley classified project governance into formal mechanisms and informal mechanisms [14]. The former one is measured by collective cost estimation, risk and reward sharing regime, and design integration; the latter is measured by leadership, team integration, team workshops, and communication systems. Benitez-Avila et al. and Lu et al. measure project governance by contractual and relational governances in construction projects [22,23]. Lu et al. measured governance mechanisms by contract governance and trust [24]. Caniëls et al. classified the project governance mechanisms into contractual incentives, authority, and relational governance in complex procurement projects [25]. Olsen et al. developed a contractual framework arguing that different combinations of incentives, authority, and trust should govern the procurements [26]. Henisz et al. emphasized the institutional concepts including ‘regulative’ institutional supports (e.g., laws, regulations, contracts and their enforcement through mediation [16], arbitration or litigation), institutional supports that are ‘normative’ (e.g., socially shared expectations of appropriate behavior and social exchange processes), and ‘cognitive’ (e.g., creating shared identities, scripts or conceptual frameworks to bridge differences in values or interests). Zheng et al. put forward three varieties of governance mechanisms: contract, trust, and institutional support [27].
In conclusion, numerous researches have been conducted on project governance and showed that contractual governance and relational governance are the main dimensions [28]. However, few studies of project governance consider the situation of mega-infrastructure projects in China. As a special construction unit, administrative instructions from the government play an important role in regulating inter-organizational relations. If the organizational model is properly constructed, the governance from the government can effectively promote projects and effectively balance conflicts of public interests [19]. The government-led governance mechanism is defined as “governmental governance”. Since the government has special political characteristics, social function, and the absolute decision in the mega-infrastructure projects of government-led investment, it is necessary to regard the governmental governance mechanism as equally important as contractual governance and relational governance. Thus, the three-dimensional governance framework is hypothesized as “contractual–relational–governmental” of mega-infrastructure projects in this study.
The contractual governance mechanism refers to a series of formal institutional arrangements, including contracts and relevant regulations signed by project participants [29]. Based on the literature review, content analysis is carried out to identify the contractual governance factors of general projects, shown in Table 1. It can be seen from Table 1 that the dimensions of contractual governance mechanism mainly include risk sharing, revenue distribution, and accountability mechanism. The risk sharing mechanism aims to improve the project governance level and promote the success of the project, which is reflected in the fact that reasonable risk sharing can reduce the transaction cost of the project [15,30,31]. The revenue distribution mechanism is mainly reflected in the adjustment of contract price according to the occurrence of risk events, and the corresponding rewards and punishments for the performance of the contract [31]. The accountability mechanism means that the owner or project manager should assume basic and necessary responsibilities in the process of public resource management [15].
The relational governance mechanism is an informal and unwritten norm that can influence organizational behavior among the project participants [15,23]. Based on the literature review, content analysis is carried out to identify the relational governance factors of general projects, shown in Table 2. It can be concluded from Table 2 that the dimensions of a relational governance mechanism mainly include information sharing, problem solving, and trust mechanism. Information sharing aims to ensure the timeliness, accuracy, integrity, and adequacy of information exchange. Problem solving can be defined as the common action and willingness that can bring benefits to all participants of the project, such as common goals and cooperation willingness [15,34]. The trust mechanism can improve the contracting efficiency and focus more on solving risk problems by investigating the relationship norms and the perceived importance of personal relationships [25,35].
For the third governance force from the government, namely “governmental governance mechanism” in this study, few scholars have proposed similar concepts such as authoritative governance and hierarchical governance. Authoritative governance refers to the governance based on hierarchical authority, the function is mainly realized through linear hierarchical authority such as formal structure and authorization [26,36]. The core of authoritative governance is administrative control, which plays a role through a political contract and has great governance power. Hierarchical governance refers to a way of governance of a top-down control system relying on the power or authority to ensure high efficiency to complete normal trade within projects [25,26]. However, existing research lacks literature on the factors of governmental governance taking megaprojects as the research context. Therefore, the grounded theory research method is adopted to explore the dimensions and factors of the governmental governance mechanism in megaprojects.

3. Research Methodology

The key procedures of the qualitative–quantitative approach in this study are described as follows. Firstly, grounded theory is adopted to identify the factors of governmental governance. Secondly, two rounds of Delphi interviews are carried out to refine the factors of project governance mechanism with the characteristics of mega-infrastructure projects in China considered. Thirdly, 235 valid questionnaires are collected to develop and verify the measurement scales of project governance, including exploratory factor analysis (EFA), reliability analysis, and validity analysis.

3.1. Grounded Theory

Because existing research lacks factors of governmental governance, the grounded theory method is adopted to identify the dimensions and factors of governmental governance mechanism of megaprojects in China. Grounded theory, proposed by sociologist Glaser and Strauss in 1967, is a qualitative research method that uses systematic procedures to develop and guide inductively theories based on a certain phenomenon. The systematic procedures include theoretical sampling, data coding (open coding, axial coding, and selective coding), and theoretical saturation test [37,38]. Zhang stated that the optimal number of selecting multi-case studies is 3–6, and Eisenhardt indicated that 4–10 cases are the best for multicase studies and are the most likely to construct a strong theory [39,40]. Accordingly, 6 megaprojects participated in by the government are selected from the national five-year planning in this study to collect objects, and a total of 229 cases of governmental governance are obtained (Table 3).

3.2. Expert Survey

The aim is to collect the opinions of experts on the project governance mechanism considering the actual situation of specific mega-infrastructure. Based on initial factors sorted out by literature review and grounded theory, the expert survey is further used to refine the factors of the project governance mechanism. Two rounds of Delphi interviews are used in this study. The Delphi method is a research method in which the questionnaire is sent to experts for advice. A semi-structured questionnaire is designed, expert opinion is then collected, and statistical feedback result is obtained until the expert opinions reach consensus. The factors of contractual governance and relational governance are determined after two rounds of expert survey [41]. Most Delphi studies have no more than 20 participants [42]. Therefore, eight experts with practical experience are selected for this survey (see Figure 1). It can be seen from the Figure 1 that the most interviewed experts have more than 10 years of management experience in mega-infrastructure projects, including the owner (3), construction unit (1) and consulting unit (4).

3.3. Data Collection

A questionnaire is designed based on the identified measures of project governance with a five-point Likert scale method (1 = very inconsistent, 5 = very consistent). According to the actual situation of the selected projects, interviewees are requested to evaluate the degree of conformity between the project description and reality. To ensure the representativeness and objectivity of the opinions collected from the experts, the choices of respondents are also controlled. The experts have at least two years of work experience and are requested to report about the most recently completed mega-infrastructure project. The questionnaire survey (see Appendix A) in this study is conducted and mainly distributed in the form of a network questionnaire star which is a professional online questionnaire survey, evaluation, voting platform in China. A total of 235 valid questionnaires are collected in China, and the recovery rate is 85.00%. The statistical analysis of the collected questionnaires is shown in Table 4. It can be seen that the respondents are males (84.68%) who possess a bachelor’s degree (43.40%) and have more than ten years of work experience in mega-infrastructure projects (31.91%). The data are mainly collected from public projects (65.53%) associated with size of less than 10 hundred million CNY (40.85%) and duration of fewer than three years (54.04%).
Software SPSS version 17.0 and AMOS version 16.0 are adopted for the quantitative analysis in this study. Firstly, EFA is adopted to classify the governance factors into different dimensions in mega-infrastructure projects. A principal component method is conducted to extract the common factor, and the maximum variance method is used for factor rotation. A factor is extracted when the eigenvalue is greater than 1 and vice versa [43]. This step is supported by a high Kaiser–Meyer–Olkin (KMO) and Bartlett test. Secondly, reliability analysis is employed to check the consistency of the internal structure. Corrected-Item Total Correlation (CITC) and Cronbach’s reliability coefficient are used for reliability analysis. CITC is used as the standard of purifying items, and the reliability coefficient is used to test the internal consistency of items. Thirdly, confirmatory factor analysis (CFA) is used for the validity analysis for the measurement scales [44]. CFA is conducted using a measurement model in SEM software, which analyzes the representation of latent variables by using observable variables [45,46].

4. Results

4.1. Factors Identification of Governmental Governance

For the third governance force from the government, existing research lacks literature on the factors of governmental governance taking megaprojects as the research context. Therefore, the grounded theory research method is adopted to explore the dimensions and factors of the governmental governance mechanism in megaprojects. It aims at exploring and summarizing the core elements of the governmental governance mechanism in megaprojects from relevant materials of cases and interviews. The specific research process and results are as follows.
Step 1: Open coding
The process of open coding refers to the gradual conceptualization and categorization of the data collected in the case. The collected data are categorized, and concepts are extracted and then reorganized without personal subjective intention [47]. The manual coding method is adopted in this study, and it mainly includes two steps. The first step is labeling. Labeling refers to screening out the information related to the research topic (governmental governance mechanism) and labeling the information with independent sentences. A total of 229 tags are labeled from the text data of typical cases of megaprojects. Similarly, 26 instances are extracted from the expert interview data for the theoretical saturation test. The second step is conceptualization and categorization. The process refers to assigning specific concepts to the phenomena represented by the 229 tags, further classifying related concepts into a category. Sixty-five categories are extracted after the categorization of key elements of governmental governance mechanism.
Step 2: Axial coding
The purpose of axial coding is to explore the relationships among conceptual categories and further refine the categories extracted from open coding. Combining the inter-relationships and logical order of different categories at the conceptual level, the categories most related to the research objectives are further classified and selected as the main category [38]. After comparing 229 concepts and 65 extraction categories of open coding, 3 main categories and 11 secondary categories of governmental governance are obtained considering the actual situation of megaprojects. The results are tabulated in Table 5.
Step 3: Selective coding
Selective coding refers to the identification of core categories that can connect other categories by analyzing the “main clues” of data. The definition of the core category can be selected from existing categories, and it can be refined at a more abstract level according to the needs of explaining core phenomena [38]. “Governmental governance mechanism of megaprojects” is selected as the core code, and the idea of the storyline is adopted to guide the code in this study. The first step is to define the storyline in this study as “to promote the successful implementation of megaprojects, the government often governs the projects through decision, supervision and coordination mechanism”. The second step is to compare the main and secondary categories and take the government decision, government supervision, and government coordination as the specific mechanism of governmental governance in the implementation of megaprojects. The third step is to analyze the core category and its relationships with other categories. For instance, “government decisions” (A1) is regarded as one mechanism of governmental governance in megaprojects. The main way is the development of planning or management methods (a1), which includes the establishment of development planning (aa2), creation of institutional environment (aa3), and formulation of administrative measures for immigration work (aa4). Through systematic analysis, the constitutional system of governmental governance mechanism is established, including the core category, main category, secondary category, and concept.
Step 4: Theoretical saturation test
The theory tends to be saturated when there is no new category obtained. In this case, the theoretical saturation test is required to ensure the reliability of the model. It can be concluded that the integration process of the model is reliable and the theoretical saturation is achieved. Hence, the governmental governance mechanism includes government decision, government supervision, and government coordination. Government decision refers to the decisions made by the government on policies and resource allocation of megaprojects by administrative instructions. Government supervision refers to the supervision function exercised by the government on the construction plan and fundraising management. Government coordination means that governments adopt the administrative rights to have coordination among central departments.

4.2. Framework Establishment of Project Governance

Two rounds of Delphi interviews are used to refine the factors of the project governance mechanism considering the actual situation of specific mega-infrastructure. In the first round of Delphi expert interviews, the factors of project governance are supplemented and improved as follows. Firstly, the accountability mechanism is deleted from contractual governance. Through interviews, the consensus is achieved that the significance of accountability mechanism is not clear in mega-infrastructure projects, and it is suggested to be deleted. Secondly, the trust dimension is deleted and is merged into relational governance because trust is the result of relational governance. Thirdly, cultural development is supplemented to relational governance. The sense of belonging can be strengthened through continuous cultural construction activities in mega-infrastructure projects under the Chinese context. For instance, project culture like “project interests above all” and “the one-hundred-day pledging” in Expo 2010 helps improve project performance [19]. Fourthly, measures of the governmental governance mechanism are supplemented.
In the second round of the Delphi interview, the modified project governance factors are sent back to the experts for evaluating the results of the first round. The results show that consensus has been reached on the revised project governance mechanism. Hence, through two rounds of interviews, the contractual governance mechanism is summarized as risk sharing and revenue distribution, the relational governance mechanism includes information sharing, problem solving, and cultural development, and the governmental governance mechanism is summarized as government decision, government supervision, and government coordination. The measures of the governance mechanism in mega-infrastructure projects are tabulated in Table 6.

4.3. Development and Validation of Measurement Scales

Based on identified factors of project governance, a questionnaire survey is designed and 235 data are collected to refine and validate the project governance scales. Firstly, EFA is conducted to refine the PG framework quantitatively in consideration of the possible strong correlation between factors of project governance. Before factor analysis, Kaiser–Meyer–Olkin (KMO) and Bartlett tests are carried out on the factors of project governance. Results show that the KMO value is 0.921, greater than 0.8. Bartlett of spherical test χ 2 value significance level is less than 0.05 with statistical significance. Thus, the data is suited for EFA. The factor extraction is based on the standard that the eigenvalue is greater than 1, and the factor extraction is stopped when the eigenvalue is less than 1. The results of factor analysis show that seven factors are extracted from the 34 items of project governance, and the total variance of the accumulative interpretation of the factors is 68.281%, greater than 60%. The factor loads of the items are above 0.400, indicating that the seven common factors extracted can effectively reflect the 34 variables. However, the extracted factors deviate greatly from the dimensions in project governance. Therefore, some items are considered to be deleted. Factor analysis of 30 variables is carried out after deleting IS4, CD1, GS2, and RD2, and the results are tabulated in Table 7. It can be seen that the total variance of the six factors extracted is 68.430%, greater than 60%. The factor loading of all items is above 0.400, indicating that the six common factors extracted can effectively reflect 30 variables.
The results in Table 7 show that six factors are identified for project governance in mega-infrastructure. Factor 1 includes items IS2, IS3, SP4, IS1, SP5, SP3, SP1, and SP2, namely three items of information sharing (IS) and five items of problem solving (SP). These items can reflect the measures of maintaining the relationship, so factor 1 is named as relationship maintenance. Factor 2 includes items GD1, GD3, GD2, GS1, GS3, and GS4, namely three items of government decision (GD) and three items of government supervision (GS). These items can reflect the governing measures by the government, thus factor 2 is merged as government regulation. Factor 3 includes items GC3, GC1, GC2, and GC4, which are consistent with the governmental coordination of governmental governance; thereby, it is retained as governmental coordination. Factor 4 includes items RS2, RS1, RS3, RS4, and RS5, which are consistent with the risk sharing (RS) of contractual governance—hence, retained as risk sharing. Factor 5 includes items RD4, RD5, RD1, and RD3, which are consistent with the revenue distribution (RD) of contractual governance (except item RD2). Therefore, the name is retained as revenue distribution. Factor 6, including items CD2, CD3, and CD4, is consistent with the cultural development (CD) of relational governance (except item CQ1); therewith the name is retained as cultural development.
Secondly, reliability analysis is conducted to evaluate the consistency of the internal structure of project governance [43]. In this study, Corrected-Item Total Correlation (CITC) and Cronbach’s reliability coefficient are used for reliability analysis. CITC is used as the standard for purification clauses, and 0.3 is the critical value for judging whether clauses should be deleted. If the CITC value is less than 0.3 and can be increased after being deleted, the clauses should be deleted [43]. The reliability coefficient α is used to test the internal consistency of terms. The lowest α coefficient at different subscales should be above 0.50 and preferably higher than 0.60, while the lowest coefficient for the whole scale should be above 0.70 and preferably higher than 0.80 [43]. The reliability analysis results of each item in the project governance scale are tabulated in Table 8. It can be seen from Table 8 that the overall Cronbach’s coefficient value of subscales of project governance is greater than 0.60, with good internal consistency and reliability. The CITC values are greater than 0.300, indicating a high consistency between the sum of each item and the rest. The values of Cronbach’s Alpha after item deleted are less than Cronbach’s Alpha, indicating good internal consistency reliability.
Thirdly, CFA is adopted for the validity test of project governance scales using AMOS software. The overall model of the project governance mechanism is depicted in Figure 2, and the results are tabulated in Table 9. From the perspective of the absolute fitting index, χ 2 / d f = 1.088 and p = 0.130 > 0.01 , which does not reach a significant level. Thus, the assumption is supported that the covariance matrix of the measurement model of the project governance mechanism is equal to the covariance matrix of empirical data. Hence, the hypothesis model is consistent with the observed data. Other indicators need to be further observed, GFI = 0.914 (>0.80), AGFI = 0.879 (>0.80), RMSEA = 0.019 (<0.08), indicating that the model is acceptable. By observing the relative fitting indicators, IFI = 0.994 (>0.90), CFI = 0.994 (>0.90), and NFI = 0.930 (>0.80), it can be concluded that the model has good construct validity. In terms of convergent validity, the factor load of most variables is greater than the critical value of 0.5. It shows that the model has good convergent validity. In terms of combined reliability, the standardized load of all measurement items reaches the critical value of 0.5, and all standardized coefficients reach a significant level. It concludes that these 30 indicators can reflect the six dimensions of project governance. Besides, the combined reliability value shows that all variables have reached a critical value of 0.6, except for revenue distribution. Hence, the internal consistency of each variable of the project governance mechanism is good and has good reliability.

5. Discussions

The multidimensional framework of governance mechanisms for mega-infrastructure projects includes contractual governance, relational governance, and governmental governance. The results prove that the 30 factors classified as six dimensions can measure the project governance of mega-infrastructure projects in China. This research contributes to knowledge and practice in the field of mega-infrastructure projects in two specific ways.
The first and most important contribution of this research is the identification of the factors of governmental governance in mega-infrastructure projects in China. Governmental governance mechanism is the active control behavior and mechanism carried out by the government to promote the construction of mega-infrastructure projects. The research fills the gaps of governmental governance and firstly identifies the factors of governmental governance based on the six cases of mega-infrastructure projects in China with grounded theory. The results show that the governmental governance mechanism includes government decision, government supervision, and government coordination. Governmental governance reflects the particularity of the governance mechanism of mega-infrastructure projects under the background of Chinese culture. Like an expert pointed out, “in fact, our mega-infrastructure projects are government-led in China. The government can gather all the strength of the country to achieve great events, such as Olympics, earthquake, and Expo”.
In the process of project governance, the government in China plays an important role in decision making due to the complexity of mega-infrastructure projects. The government is the public administrator and the indirect owner of the project. The goal is to ensure the implementation of the project and the realization of the social and economic benefits project involved. Moreover, local governments have indeed invested a great deal of enthusiasm in the construction of mega-infrastructure projects. It strengthens the role of governmental governance in mega-infrastructure projects. The pursuit of political achievements is the main incentive factor for local officials because the construction of mega-infrastructure projects is the most significant indicator of political achievements. These incentives contribute to the high speed and efficiency of the construction of mega-infrastructure projects. China has built highly developed urban infrastructures and a series of mega-infrastructure projects in a few decades, which proves the role of governmental governance.
The second contribution of this research is that it provides a comprehensive and quantifiable measurement framework of project governance for mega-infrastructure. It can be used by the research and industry to measure and quantify the integration of project governance in the context of mega-infrastructure in China. The lack of a project governance framework in mega-infrastructure and the need to address it has been highlighted by previous studies [48,49]. Based on the literature review, existing research focuses on contractual governance and relational governance mechanisms. However, the government, as a special construction unit for mega-infrastructure projects in the Chinese context, has a significant role in regulating the inter-organizational relationship with its administrative directive. Governmental governance can effectively promote the project and balance the conflicts among public interests [19]. At this point, the two-dimensional governance framework of “contractual–relational” is extended to the three-dimensional framework of “contractual–relational–governmental” in the field of mega-infrastructure projects to fit the situation of China.
Furthermore, the scales of project governance are developed and validated by quantitative analysis with 235 valid questionnaires. The results of EFA show that the 30 identified factors of project governance are classified into six dimensions of government regulation, government coordination, risk sharing, revenue distribution, relationship maintenance, and cultural development. Specifically, the scale of government regulation includes items GD1, GD2, GD3, GS1, GS3, and GS4; the scale of government coordination includes items GC1, GC2, GC3, and GC4; the scale of risk sharing includes items RS1, RS2, RS3, RS4, and RS5; the scale of revenue distribution includes items RD1, RD3, RD4, and RD5; the scale of relationship maintenance includes items IS1, IS2, IS3, SP1, SP2, SP3, SP4, and SP5; the scale of cultural development includes items CD2, CD3, and CD4. The validated framework proposed by this research enables owners and managers of mega-infrastructure projects to evaluate and improve governance ability. The framework can also function as a measuring tool in academia to help gain insight into the multidimensions of governance mechanism to explore the impacts on project performance.

6. Conclusions and Future Works

This study builds a measurement framework of project governance for mega-infrastructure considering the institutional situation in China, adopting the panoramic qualitative method of grounded theory and the empirical method of a questionnaire survey. Through clustering analysis of 229 cases of governmental governance based on the six typical megaprojects, the qualitative research method of grounded theory is used to identify the factors of governmental governance. Through semi-structured interviews from the practice of eight experts, the measures of project governance are refined considering the context of mega-infrastructure projects, and the framework of the governance mechanism for megaprojects is built as (CG, RG, GG). On this basis, through the investigation of 235 project managers of mega-infrastructure projects in China, the measurement scales of project governance for mega-infrastructure are developed and validated quantitatively.
In terms of qualitative and quantitative studies, the obtained research findings are presented as follows. (1) The factors of governmental governance are identified based on the six cases of mega-infrastructure projects in China with grounded theory, and the governmental governance mechanism includes government decision, government supervision, and government coordination. (2) The three-dimensional framework of project governance is established as “contractual–relational–governmental” in the field of mega-infrastructure projects. (3) The measurement scales of project governance are developed and validated for mega-infrastructure, including government regulation, government coordination, risk sharing, revenue distribution, relationship maintenance, and cultural development. This contribution of this research lies in developing the measuring scale of project governance that is capable of depicting the governance mechanisms systematically in mega-infrastructure projects. It can help us understand project governance in mega-infrastructure and can facilitate managers to take appropriate actions to enhance the ability of project governance.
However, the research has some limitations. The research result is obtained based on the data of mega-infrastructure projects collected in China; particularly, the governmental governance mechanism has a special situation of Chinese projects. Therefore, more research should be done in other countries to compare the results and obtain more generic results about the measurement scales. Besides, the research provides a framework of project governance for mega-infrastructure including contractual governance, relational governance, and governmental governance. Future studies could consider the relationship and interactions among the three dimensions of project governance.

Author Contributions

Methodology: L.L.; formal analysis: Y.Y.; data curation: J.Z.; writing—original draft preparation: L.L.; review and editing: Y.Y.; handle consultation regarding the paper: J.X.; supervision: J.Z.; project administration: J.X. All authors have read and agreed to the published version of the manuscript.

Funding

This research is funded by the National Natural Science Foundation of China [71901113, 72061025, 71640012, and 71971161], the Natural Science Foundation of Jiangxi Province in China [20212ACB214014], and the Social Science Foundation of Jiangxi Province in China [21GL05].

Institutional Review Board Statement

Ethical review and approval were waived for this study, due to three reasons. Firstly, the questionnaire survey in this study was conducted electronically. In the network survey, the network investigator is allowed to choose their identity name and password. Secondly, this study uses email to inform respondents about the survey and provide links, and these addresses are only accessible to selected respondents. Thirdly, each email contains informed consent and provides sufficient written information to potential respondents to determine whether they can complete the survey.

Informed Consent Statement

Informed consent was obtained from all subjects involved in the study.

Data Availability Statement

The data presented in this study are available on request from the corresponding author. The data are not publicly available due to the terms which has been stated in the informed consent that the questionnaire data are only for research.

Conflicts of Interest

Authors declare no conflict of interest.

Appendix A

Survey of project governance in megaprojects
Instructions: This questionnaire contains items about different factors influencing project governance. Use the following criteria (Table A1) when responding to the description of each factor by circling the number from the scale below (Table A2).
Table A1. Criteria of the definition of project governance levels.
Table A1. Criteria of the definition of project governance levels.
ScoreDegreeCriteria
1Very inconsistentThe description is very inconsistent with the actual situation of megaprojects
2InconsistentThe description is inconsistent with the actual situation of megaprojects
3NeutralProject participants have a neutral attitude about the description
4ConsistentThe description is consistent with the actual situation of megaprojects
5Very consistentThe description is very consistent with the actual situation of megaprojects
Table A2. Question survey of project governance.
Table A2. Question survey of project governance.
ItemQuestion SurveyDegree of Consistency
Risk sharingThe contract is clear about the responsibilities and rights of the parties and the project objectives12345
The contract has clear procedures and principles for dealing with the risk of future disputes12345
The contract specifies the specific measures to be taken by each party in the event of unforeseen events12345
The contract gives full consideration to the interests of the parties involved in dispute settlement or disagreed matters12345
The contract gives full consideration to the responsibilities and rights of the parties involved in dispute settlement or matters not agreed upon12345
Revenue distributionThe contract provides incentives for early completion and investment savings12345
The contract contains penalty clauses for failure to perform the contract effectively12345
The revenue of participates is in line with the project’s size, complexity, special requirements, etc.12345
Price adjustment are set and paid for changes in laws, regulations, and relevant policies12345
Price adjustments are set and paid for price fluctuations and engineering changes12345
Information sharingThe parties timely notify the relevant information, changes, and events12345
The information exchanged between the participants is accurate12345
The sharing of information among the various participants is adequate12345
Informal channels are often used to communicate between the participants12345
Problem solvingAll participants of the project actively cooperate to solve the conflicts and disputes during the cooperation12345
The project provides relevant support to help other participants resolve their problems12345
All parties of the project deal with unexpected changes objectively and share responsibility12345
All parties of the project mobilize the resources to solve the problems encountered during the implementation of the project12345
When unforeseen situations arise, project parties work together to find solutions12345
Cultural developmentThe project often have dinner with main partners, send small gifts to each other, and organize activities such as investigation and study12345
The project encourages all parties to establish project partnerships on a contractual basis12345
The project actively advocates a pleasant project culture12345
The project carries out cultural construction activities such as labor competition, community construction, civilized construction site, and party member vanguard12345
Government decisionGovernment departments formulate relevant planning or management methods for the project12345
Government departments make decisions on policies and major steps in project construction12345
Government departments formulate reasonable allocation plans for project resources12345
Government supervisionGovernment departments establish project legal persons and supervise the scientific decisions12345
Government departments supervise project construction procedures, construction process plans and changes, quality, and environmental protection, etc12345
Government departments supervise project work plans, personnel management matters, tendering and contract management12345
Government departments supervise and control the total amount of project investment and the raising, management, and use of project construction funds12345
Government coordinationGovernment departments are responsible for organizing or coordinating land expropriation, demolition, and resettlement12345
Government departments are responsible for coordinating the social interests involved in the project12345
Government departments are responsible for coordinating the relations between central departments and between central and local governments12345
The government departments are responsible for coordinating public affairs related to the project12345

References

  1. Tamošaitienė, J.; Sarvari, H.; Chan, D.W.M.; Cristofaro, M. Assessing the Barriers and Risks to Private Sector Participation in Infrastructure Construction Projects in Developing Countries of Middle East. Sustainability 2021, 13, 153. [Google Scholar] [CrossRef]
  2. Flyvbjerg, B. What you should know about megaprojects and why: An overview. Proj. Manag. J. 2014, 45, 6–19. [Google Scholar] [CrossRef] [Green Version]
  3. Lin, Y.S.; Chou, J.S.; Chiou, C.H. Reengineered Governance Process for Assessing Core Public Infrastructure Projects. Sustainability 2021, 13, 9669. [Google Scholar] [CrossRef]
  4. Chaisse, J.; Julien, M. China’s ‘Belt and Road’ Initiative: Mapping the World Trade Normative and Strategic Implications. J. World Trade 2018, 52, 163–165. Available online: https://www.webofscience.com/wos/woscc/full-record/WOS:000427325400008 (accessed on 12 September 2021).
  5. Wang, H.; Lu, M. China Goes Global: The Impact of Chinese Overseas Investment on Its Business Enterprises; Springer: Berlin/Heidelberg, Germany, 2016. [Google Scholar]
  6. Hu, Y.; Le, Y.; Gao, X.; Li, Y.; Liu, M. Grasping institutional complexity in infrastructure mega-projects through the multi-level governance system: A case study of the Hong Kong–Zhuhai–Macao Bridge construction. Front. Eng. Manag. 2018, 5, 52–63. [Google Scholar] [CrossRef] [Green Version]
  7. Li, Y.; Han, Y.; Luo, M.; Zhang, Y. Impact of Megaproject Governance on Project Performance: Dynamic Governance of the Nanning Transportation Hub in China. J. Manag. Eng. 2019, 35, 05019002. [Google Scholar] [CrossRef]
  8. Love, P.E.D. Plugging the Gaps’ Between Optimum Bias and Strategic Misrepresentation and Infrastructure Cost Overruns. Procedia Eng. 2011, 14, 1197–1204. [Google Scholar] [CrossRef] [Green Version]
  9. Vrchota, J.; Řehoř, P.; Maříková, M.; Pech, M. Critical Success Factors of the Project Management in Relation to Industry 4.0 for Sustainability of Projects. Sustainability 2021, 13, 281. [Google Scholar] [CrossRef]
  10. Biesenthal, C.; Wilden, R. Multi-level project governance: Trends and opportunities. Int. J. Proj. Manag. 2014, 32, 1291–1308. [Google Scholar] [CrossRef] [Green Version]
  11. Too, E.G.; Weaver, P. The management of project management: A conceptual framework for project governance. Int. J. Proj. Manag. 2014, 32, 1382–1394. [Google Scholar] [CrossRef]
  12. Brunet, M. Governance-as-practice for major public infrastructure projects: A case of multilevel project governing. Int. J. Proj. Manag. 2019, 37, 283–297. [Google Scholar] [CrossRef]
  13. Müller, R.; Zhai, L.; Wang, A.; Shao, J. A framework for governance of projects: Governmentality, governance structure and projectification. Int. J. Proj. Manag. 2016, 34, 957–969. [Google Scholar] [CrossRef]
  14. Chen, L.; Manley, K. Validation of an instrument to measure governance and performance on collaborative infrastructure projects. J. Constr. Eng. Manag. 2014, 140, 04014006. [Google Scholar] [CrossRef] [Green Version]
  15. Yan, L.; Shi, Z.; Yan, M.; Deng, J. Contractual governance and relational governance in public construction project: Substitutes or complements? China Civ. Eng. J. 2016, 49, 115–128. (In Chinese) [Google Scholar]
  16. Henisz, W.J.; Levitt, R.E.; Scott, W.R. Toward a unified theory of project governance: Economic, sociological and psychological supports for relational contracting. Eng. Proj. Organ. J. 2012, 2, 37–55. [Google Scholar] [CrossRef]
  17. You, J.; Chen, Y.; Wang, W.; Shi, C. Uncertainty, opportunistic behavior, and governance in construction projects: The efficacy of contracts. Int. J. Proj. Manag. 2018, 36, 795–807. [Google Scholar] [CrossRef]
  18. Zheng, X.; Lu, Y.; Le, Y.; Li, Y.; Fang, J. Formation of interorganizational relational behavior in megaprojects: Perspective of the extended theory of planned behavior. J. Manag. Eng. 2017, 34, 04017052. [Google Scholar] [CrossRef]
  19. Zhai, Z.; Ahola, T.; Le, Y.; Xie, J. Governmental governance of megaprojects: The case of EXPO 2010 Shanghai. Proj. Manag. J. 2017, 48, 37–50. [Google Scholar] [CrossRef]
  20. Turner, J.R.; Keegan, A. Mechanisms of governance in the project-based organization: Roles of the broker and steward. Eur. Manag. J. 2001, 19, 254–267. [Google Scholar] [CrossRef]
  21. Musawir, A.U.; Abd-Karim, S.B.; Mohd-Danuri, M.S. Project governance and its role in enabling organizational strategy implementation: A systematic literature review. Int. J. Proj. Manag. 2020, 38, 1–16. [Google Scholar] [CrossRef]
  22. Benitez-Avila, C.; Hartmann, A.; Dewulf, G.; Henseler, J. Interplay of relational and contractual governance in public-private partnerships: The mediating role of relational norms, trust and partners’ contribution. Int. J. Proj. Manag. 2018, 36, 429–443. [Google Scholar] [CrossRef] [Green Version]
  23. Lu, P.; Guo, S.; Qian, L.; He, P.; Xu, X. The effectiveness of contractual and relational governances in construction projects in China. Int. J. Proj. Manag. 2015, 33, 212–222. [Google Scholar] [CrossRef]
  24. Lu, P.; Cai, X.; Wei, Z.; Song, Y.; Wu, J. Quality management practices and inter-organizational project performance: Moderating effect of governance mechanisms. Int. J. Proj. Manag. 2019, 37, 855–869. [Google Scholar] [CrossRef]
  25. Caniëls, M.C.J.; Gelderman, C.J.; Vermeulen, N.P. The interplay of governance mechanisms in complex procurement projects. J. Purch. Supply Manag. 2012, 18, 113–121. [Google Scholar] [CrossRef]
  26. Olsen, B.E.; Haugland, S.A.; Karlsen, E.; Husøy, G.J. Governance of complex procurements in the oil and gas industry. J. Purch. Supply Manag. 2005, 11, 1–13. [Google Scholar] [CrossRef]
  27. Zheng, X.; Lu, Y.; Chang, R. Governing Behavioral Relationships in Megaprojects: Examining Effect of Three Governance Mechanisms under Project Uncertainties. J. Manag. Eng. 2019, 35, 04019016. [Google Scholar] [CrossRef] [Green Version]
  28. Guevara, J.; Garvin, M.J.; Ghaffarzadegan, N. The Forest and the Trees: A Systems Map of Governance Interdependencies in the Shaping Phase of Road Public–Private Partnerships. J. Manag. Eng. 2020, 36, 04019031. [Google Scholar] [CrossRef]
  29. Cheung, S.O.; Wong, W.K.; Yiu, T.W.; Kwok, T.W. Exploring the influence of contract governance on construction dispute negotiation. J. Prof. Issues Eng. Educ. Pract. 2008, 134, 391–398. [Google Scholar] [CrossRef]
  30. Chang, C.Y. Risk-bearing capacity as a new dimension to the analysis of project governance. Int. J. Proj. Manag. 2015, 33, 1195–1205. [Google Scholar] [CrossRef] [Green Version]
  31. Deng, J.; Deng, X.; Yan, L. A study of the institutional innovation of public project agent incentives: An empirical analysis of key governance factors. Forecasting 2013, 5, 57–62. (In Chinese) [Google Scholar]
  32. Henisz, W.J.; Levitt, R.E. Regulative, Normative and Cognitive Institutional Supports for Relational Contracting in Infrastructure Projects. Working Paper 55.2, Collaboratory for Research on Global Projects, Stanford. 2011. Available online: https://www.researchgate.net/publication/228759483 (accessed on 12 September 2021).
  33. Zhou, X.; Wang, Y.; Ling, L. Research on the governance mechanism of engineering projects based on stakeholder theory. J. Anhui Univ. Technol. Soc. Sci. 2011, 28, 45–46. (In Chinese) [Google Scholar] [CrossRef]
  34. Deng, J.; Yan, L.; Wu, S. Research on relation governance of public projects in Chinese context: Definition, structure and scale. Manag. Rev. 2015, 27, 213–222. (In Chinese) [Google Scholar]
  35. Liu, C. Research on Project Governance Machnisms’ Influence on Knowledge Transfer in the Project Context-Taking Construction Projects as an Example; Beijing Jiaotong University: Beijing, China, 2016. (In Chinese) [Google Scholar]
  36. Hällgren, M.; Lindahl, M. Coping with lack of authority. Int. J. Manag. Proj. Bus. 2017, 10, 244–262. [Google Scholar] [CrossRef] [Green Version]
  37. Corbin, J.M.; Strauss, A. Grounded theory research: Procedures, canons, and evaluative criteria. Qual. Sociol. 1990, 13, 3–21. [Google Scholar] [CrossRef]
  38. Pandit, N.R. The creation of theory: A recent application of the grounded theory method. Qual. Rep. 1996, 2, 1–15. [Google Scholar] [CrossRef]
  39. Zhang, J. The Application of Grounded Theory Method to Management Research. Sci. Technol. Manag. Res. 2010, 30, 235–237. [Google Scholar]
  40. Eisenhardt, K.M. Building theories from case study research. Acad. Manag. Rev. 1989, 14, 532–550. [Google Scholar] [CrossRef]
  41. Martino, J.P. The Delphi Method: Techniques and Applications: Linstone; Harold, A., Turoff, M., Eds.; Addison-Wesley: Amsterdam, The Netherlands, 1975. [Google Scholar] [CrossRef]
  42. Ludwig, B. Predicting the future: Have you considered using the Delphi methodology. J. Ext. 1997, 35, 1–4. [Google Scholar]
  43. Wu, M. A Practice in Statistical Analysis of the Questionnaire—SPSS Operation and Application; Chongqing University press: Chongqing, China, 2010. [Google Scholar]
  44. Wu, M. Structural Equation Modeling: The Manipulation and Application of AMOS, 2nd ed.; Chongqing University press: Chongqing, China, 2011. [Google Scholar]
  45. Sun, Z.-Y.; Zhou, J.-L.; Gan, L.-F. Safety assessment in oil drilling work system based on empirical study and Analytic Network Process. Saf. Sci. 2018, 105, 86–97. [Google Scholar] [CrossRef]
  46. Jöreskog, K.G.; Sörbom, D. LISREL 8: Structural Equation Modeling with the SIMPLIS Command Language; Scientific Software International: Chicago, IL, USA, 1993. [Google Scholar]
  47. Moghaddam, A. Coding issues in grounded theory. Issues Educ. Res. 2006, 16, 52–66. [Google Scholar]
  48. Brunet, M.; Aubry, M. The three dimensions of a governance framework for major public projects. Int. J. Proj. Manag. 2016, 34, 1596–1607. [Google Scholar] [CrossRef]
  49. Christensen, T. The Norwegian front–end governance regime of major public projects. Int. J. Manag. Proj. Bus. 2011, 4, 218–239. [Google Scholar] [CrossRef] [Green Version]
Figure 1. Background of the expert survey: (a) management experience in mega-infrastructure projects; (b) participators in mega-infrastructure projects.
Figure 1. Background of the expert survey: (a) management experience in mega-infrastructure projects; (b) participators in mega-infrastructure projects.
Sustainability 14 00593 g001
Figure 2. CFA analysis of the overall model of project governance mechanism.
Figure 2. CFA analysis of the overall model of project governance mechanism.
Sustainability 14 00593 g002
Table 1. Content analysis of the dimensions of contractual governance.
Table 1. Content analysis of the dimensions of contractual governance.
DimensionsHenisz and Levitt [32]Caniëls et al. [25]Olsen et al. [26]Chen and Manley [14]Yan et al. [15]Zhou et al. [33]
Risk sharing
Revenue distribution
Accountability mechanism
Table 2. Content analysis of the dimensions of relational governance.
Table 2. Content analysis of the dimensions of relational governance.
DimensionsCaniëls et al. [25]Henisz and Levitt [32]Chen and Manley [14]Olsen et al. [26]Lu et al. [23]Yan et al. [15]Zhou et al. [33]Deng et al. [34]Liu [35]Lu et al. [24]
Information sharing
Problem solving
Trust mechanism
Table 3. List of selective projects for identifying governmental governance.
Table 3. List of selective projects for identifying governmental governance.
No.ProjectInvestment (CNY)Related CityProject TypeCode RangeItems Count
1Hong kong-Zhuhai-Macao bridge project72 billionHong Kong-Zhuhai-MacauLong span bridgesaaa1–aaa6868
2The high-speed line between Beijing and Shanghai220 billionBeijing-ShanghaiHigh-speed railwayaaa69–aaa768
3South-to-North water diversion middle route project92 billionNanyang-BeijingWater conservancy projectaaa77–aaa12044
4Qinghai-Tibet railway phase II project33 billionXining-LhasaRailwayaaa121–aaa14525
5Three Gorges project248 billionYichan-ChongqingWater conservancy projectaaa146–aaa21368
6West-East gas pipeline phase II project46 billionHorgos-GuangzhouEnergy facilitiesaaa214–aaa22916
Sum 229
Table 4. Statistical analysis of the returned 235 valid questionnaires.
Table 4. Statistical analysis of the returned 235 valid questionnaires.
CharacteristicCategoryFrequencyPercentage (%)
GenderMale19984.68%
Female3615.32%
EducationPh.D.6025.53%
Master4318.30%
Bachelor10243.40%
others3012.77%
Working experience≤3 years6628.09%
3−5 years5121.70%
6−10 years4318.30%
>10 years7531.91%
Project typePublic projects15465.53%
Public–private partnership projects3514.89%
Private projects4619.57%
Project investment<10 hundred million CNY9640.85%
10−40 hundred million CNY8435.74%
>40 hundred million CNY5523.40%
Project duration≤3 years12754.04%
4−5 years7531.91%
>5 years3314.04%
Table 5. Axial coding of governmental governance mechanism in megaprojects.
Table 5. Axial coding of governmental governance mechanism in megaprojects.
Main CategorySecondary CategoryExtraction Category of Open Coding
A1 Government decisiona1 Development of planning or management methodsaa1 Formulation of policies and management methods
aa2 Establishment of development planning
aa3 Development of the institutional environment
aa4 Formulation of administrative measures for immigration work aa5 Formulation of policy suggestions on hub project, power transmission and transformation project
aa6 Establishment of the related regulation proposal
aa7 Development of plans and policies for development areas
aa8 Establishment of immigration resettlement plans
a2 Development of decision-making guidelines and policiesaa9 Decision making of policies and guidelines in project construction
aa10 Decision making of major steps in project construction
aa11 Development of water price policies
aa12 Development of national laws, regulations, and policies
a3 Development of resource allocation plansaa13 Development of resource allocation plans
aa14 Optimization of resource allocation
aa15 Development of water resource allocation plans
A2 Government supervisiona4 Establishment of project entity and supervision of scientific decisionsaa16 Establishment of project entity
aa17 Supervision of scientific decision making
aa18 Supervision of project operation
aa19 Supervision of implementation of matters decided by the meeting
aa20 Supervision of implementation of immigration relocation planning
aa21 Supervision and inspection of project construction parties responsibility
a5 Supervision of construction procedure and scheme changeaa22 Supervision of project construction procedures
aa23 Supervision of construction process plan and change
aa24 Supervision of environmental protection
aa25 Supervision of audit
aa26 Supervision of construction pollution control
aa27 Reviewing major changes to the initial design
aa28 Supervision of spot check quality assessment
aa29 Supervision and inspect of engineering entity quality
aa30 Supervision of the whole process of project construction
aa31 Organization of engineering acceptance work
a6 Supervision of bidding and contract managementaa32 Supervision of project work plans
aa33 Supervision of personnel management matters
aa34 Supervision of bidding
aa35 Supervision of contract management
aa36 Supervision of the overall balance of plans, funding, and project progress
a7 Supervision of construction fundraising and managementaa37 Supervision of total project investment
aa38 Supervision of project construction fundraising and management use
aa39 Supervision of the implementation of investment planning aa40 Monitoring and reviewing annual investment price indices and spreads
aa41 Monitoring and reviewing reserve fund and investment surplus use plans
aa42 Monitoring and reviewing increased project investment due to policy changes
A3 Government coordinationa8 Coordination of land acquisition, demolition, and resettlementaa43 Coordination of land acquisition and demolition
aa44 Coordination of relocation of immigrants
aa45 Making an annual plan for immigration and relocation
aa46 Guiding immigration training
aa47 Coordination with supervision department for immigration funding
aa48 Coordination and promotion of migration and counterpart support
a9 Coordination of social interest relationsaa49 Coordination of social interest relationship involved in the project
aa50 Coordination of interest relationship between water transfer area and demand area
aa51 Coordination of relationship between water transfer, flood control and drought resistance
aa52 Coordination of programmatic issues, technical issues, and major policy issues
a10 Coordination of relations among central departments or central and local authoritiesaa53 Coordination of relationship between central departments and between central and local governments
aa54 Coordination of relationship between provinces
aa55 Coordination and exchange between the project and foreign governments
aa56 Coordination of administrative originations and foreign affairs
a11 Coordination of public affairs related to the projectaa57 Coordination of local supporting project construction
aa58 Coordination of external publicity
aa59 Coordination of project operation management system
aa60 Coordination of engineering comprehensive scheduling program work
aa61 Coordination of protection of cultural relics
aa62 Coordination of water saving, pollution control, and ecological environmental protection
aa63 Coordination of geological disaster control work
aa64 Coordination of technological breakthrough and localization of major engineering equipment
aa65 Coordination of ecological construction and environmental protection science and technology
Table 6. Measures of project governance for mega-infrastructure projects.
Table 6. Measures of project governance for mega-infrastructure projects.
DimensionsPotential Factors
Risk sharing (RS)Clarity of responsibilities and rights (RS1), Procedures for handling the risk of disputes (RS2), Measures to deal with unforeseen events (RS3), Rationality of interest claims (RS4), Responsibilities and rights for handling disputes (RS5)
Revenue distribution (RD)Setting of reward clauses (RD1), Setting of punishment clauses (RD2), Rationality of revenue acquisition (RD3), Contract price adjustment according to laws and regulations (RD4), Contract price adjustment according to price fluctuation (RD5)
Information sharing (IS)Timeliness of information notification (IS1), Accuracy of information exchange (IS2), Adequacy of information sharing (IS3), Informal channel communication (IS4)
Problem solving (SP)Solving conflicts and disputes through cooperation (SP1), Helping relevant parties to solve problems (SP2), Sharing responsibilities of project participators (SP3), Committing to solve project problems (SP4)
Cultural development (CD)Organizing investigation and learning activities (CD1), Establishing project partnership (CD2), Advocating pleasant project culture (CD3), Implementing labor competition and other cultural activities (CD4)
Government decision (GD)Development of planning or management methods (GD1), Development of decision-making guidelines and policies (GD2), Development of resource allocation plans (GD3)
Government supervision (GS)Establishment of project entity and supervision of scientific decisions (GS1), Supervision of construction procedure and scheme change (GS2), Supervision of bidding and contract management (GS3), Supervision of construction fundraising and management (GS4)
Government coordination (GC)Coordination of land acquisition, demolition, and resettlement (GC1), Coordination of social interest relations (GC2), Coordination of relations among central departments, central and local authorities (GC3), Coordination of public affairs related to the project (GC4)
Table 7. Results of EFA of project governance in mega-infrastructure projects.
Table 7. Results of EFA of project governance in mega-infrastructure projects.
FactorsFactor Loading%α
Relationship maintenance 15.1390.910
IS20.798
IS30.760
SP40.735
IS10.623
SP50.622
SP30.621
SP10.565
SP20.491
Government regulation 14.4040.899
GD10.853
GD30.828
GD20.779
GS10.732
GS30.556
GS40.506
Government coordination 11.7030.896
GC30.793
GC10.791
GC20.778
GC40.748
Risk sharing 11.5050.873
RS20.815
RS10.726
RS30.684
RS40.676
RS50.644
Revenue distribution 9.1190.809
RD40.788
RD50.766
RD10.718
RD30.450
Cultural development 6.5600.800
CD20.690
CD30.590
CD40.543
Note: %—the percentage of variance explained, α—Cronbach α, total variance explained = 68.430%.
Table 8. Reliability analysis of project governance.
Table 8. Reliability analysis of project governance.
DimensionsMeasure ItemsCICTCronbach’s Alpha after Item DeletedCronbach’s Alpha
Risk sharingRS10.6690.8540.873
RS20.7440.836
RS30.6440.860
RS40.7390.837
RS50.7120.844
Revenue distributionRD10.5420.8030.809
RD30.5690.786
RD40.7240.714
RD50.6820.733
Relationship maintenanceIS10.6780.9020.910
IS20.7810.893
IS30.7390.896
SP10.6960.900
SP20.5730.909
SP30.6990.901
SP40.7870.892
SP50.7350.897
Cultural developmentCD20.6400.7370.800
CD30.7090.657
CD40.5960.784
Government regulationGD10.7650.8760.899
GD20.7540.877
GD30.7860.872
GS10.7430.879
GS30.6830.888
GS40.6280.896
Government coordinationGC10.7420.8760.896
GC20.7830.861
GC30.7900.858
GC40.7650.868
Table 9. Parameter estimation of the overall measurement model of project governance mechanism.
Table 9. Parameter estimation of the overall measurement model of project governance mechanism.
DimensionsItemsStandardized Coefficient (R)t ValueR2ρcAVE
Government supervisionGD10.7900.6240.8960.592
GD20.83114.215 ***0.690
GD30.82717.231 ***0.684
GS10.77913.227 ***0.607
GS30.73511.980 ***0.540
GS40.63510.273 ***0.403
Government coordinationGC10.7850.6160.8930.675
GC20.84114.171 ***0.708
GC30.83915.633 ***0.705
GC40.82015.124 ***0.672
Risk sharingRS10.67310.060 ***0.4540.8510.535
RS20.73411.074 ***0.539
RS30.71810.947 ***0.515
RS40.7860.617
RS50.74016.213 ***0.548
Revenue distributionRD10.6050.3660.4770.784
RD30.7638.728 ***0.583
RD40.7178.463 ***0.515
RD50.6688.044 ***0.446
Cultural developmentCD20.73410.717 ***0.5380.8050.580
CD30.82311.602 ***0.677
CD40.7230.522
Relationship maintenanceIS10.75711.683 ***0.5720.9050.546
IS20.76212.012 ***0.581
IS30.73611.611 ***0.542
SP10.7480.559
SP20.5598.683 ***0.313
SP30.76712.026 ***0.588
SP40.79712.649 ***0.636
SP50.75711.826 ***0.573
Goodness of fit index (p = 0.130):
χ 2 / d f GFIAGFINFIIFICFIRMSEA
1.0880.9140.8790.9300.9940.9940.019
Note: If t value is not listed, it is a fixed parameter item. *** represents p < 0.001.
Publisher’s Note: MDPI stays neutral with regard to jurisdictional claims in published maps and institutional affiliations.

Share and Cite

MDPI and ACS Style

Luo, L.; Yang, Y.; Zheng, J.; Xie, J. Measuring Project Governance of Mega Infrastructure in China: A Scale Development Study. Sustainability 2022, 14, 593. https://0-doi-org.brum.beds.ac.uk/10.3390/su14020593

AMA Style

Luo L, Yang Y, Zheng J, Xie J. Measuring Project Governance of Mega Infrastructure in China: A Scale Development Study. Sustainability. 2022; 14(2):593. https://0-doi-org.brum.beds.ac.uk/10.3390/su14020593

Chicago/Turabian Style

Luo, Lan, Yue Yang, Junwei Zheng, and Jianxun Xie. 2022. "Measuring Project Governance of Mega Infrastructure in China: A Scale Development Study" Sustainability 14, no. 2: 593. https://0-doi-org.brum.beds.ac.uk/10.3390/su14020593

Note that from the first issue of 2016, this journal uses article numbers instead of page numbers. See further details here.