Low-Cost Pavement Management System for Developing Countries

by
Shabir Hussain Khahro
1,2,*,
Zubair Ahmed Memon
2,
Lillian Gungat
3,
Muhamad Razuhanafi Mat Yazid
1,
Abdur Rahim
4,
Muhammad Mubaraki
5 and
Nur Izzi Md. Yusoff
1,*
1
Department of Civil Engineering, Faculty of Engineering and Built Environment, Universiti Kebangsaan Malaysia, Bangi 43600, Malaysia
2
Department of Engineering Management, College of Engineering, Prince Sultan University, Riyadh 11586, Saudi Arabia
3
Faculty of Engineering, Universiti Malaysia Sabah, Kota Kinabalu 88400, Malaysia
4
Department of Transportation Engineering and Management, University of Engineering & Technology Lahore, Lahore 39161, Pakistan
5
Faculty of Engineering, Jazan University, Jazan 45142, Saudi Arabia
*
Authors to whom correspondence should be addressed.
Sustainability 2021, 13(11), 5941; https://0-doi-org.brum.beds.ac.uk/10.3390/su13115941
Submission received: 29 April 2021 / Revised: 17 May 2021 / Accepted: 19 May 2021 / Published: 25 May 2021

Abstract

:
Governments face numerous challenges in sustaining road network conditions. This is attributed to road authorities’ shortages of financial and physical infrastructure. As a result, low-cost automated solutions are being pursued to solve these problems and provide people with appropriate road conditions. Several attempts have been made to improve these technologies and incorporate them into a Pavement Management System (PMS) but limited attempts are made for developing countries. This study aimed to design a low-cost pavement management system for flexible pavement maintenance. A detailed literature review has been carried out, followed by a qualitative assessment of the various indicators considered for PMS. The priority ranks of the PMS indicators were made using an Analytical Network Process (ANP) and each rank was validated by a sensitivity assessment test using the Super Decision-Making tool. This paper also provides the conceptual framework for the low-cost PMS, followed by a fishbone diagram of the indicators and sub-indicators. It is concluded that an emergency maintenance plan with an ANP weight of (0.41) is one of the most significant plans for a low-cost PMS, followed by a routine with an ANP weight of (0.39) and periodic maintenance plans with a (0.20) ANP weight. Moreover, the functional indicators with an ANP weight of (0.32) are the most significant indicators for a low-cost PMS, followed by structural (0.26), safety (0.24), and serviceability(0.18) indicators. This model will assist the road planners in making better decisions on pavement maintenance management plans. The model will suggest the pavement sections on a higher priority to be added in the maintenance plans, especially where the maintenance budget is limited.

1. Introduction

Roads form an integral part of transport infrastructure. All other modes of transportation require road connectivity to supplement them. Maintaining roads and their better condition will improve rapid access between regional and rural communities, help in reducing poverty and, ultimately, enhance the socio-economic growth and development of any country [1,2]. Pakistan’s transport sector contributes around 10% to its Gross Domestic Product (GDP) annually. It creates around 2.3 million jobs (5.9% of the employed labor force). It is reported that due to the deprived conditions of roads, reckless driving, avoiding safety guidelines, and few other reasons, the fatality rate is 38 in 10,000 in Pakistan, which is very high compared with other countries [3].
Road reliability refers to a road’s ability to meet traffic and environmental demands over the course of its operation and serviceability to users. Road maintenance plans include road repair and rehabilitation to keep a healthy condition of roads within budgetary constraints. As a result of declines in road maintenance funding and growing environmental challenges, road management authorities are in tough circumstances to make road repair and reconstruction decisions [4]. To meet this gap, the concept of a Pavement Management System (PMS) has been introduced. A PMS is a system used by road authorities to prioritize road sections for repair and reconstruction [5,6,7,8]. It can be defined as a systematic tool for managing, planning, and allocating budgets and scheduling all pavement maintenance work to help road agencies make decisions [9,10,11].
It is reported that roads are subjected to environmental and traffic load degradation, which requires regular and periodic maintenance of roads to keep them running. These processes must be improved based on upcoming challenges [12,13]. All the asphalted roads deteriorate with time, mainly due to the load of traffic and inclement weather [14]. Maintenance programs are administered using a criterion of challenges that includes commercial intervention based on limited resources, the local climate, the type of road classification, and political considerations. Normally, the level of roughness and the useful life of the surface indicators determines the time and type of maintenance work [5]. It has also been reported in recent studies that developing countries’ road authorities have shifted their focus from the design and construction of new roads to the repair and control of the existing roads [15]. In contrast, other countries prefer to spend on modern infrastructure, but their pace has been slow in the last decade. While it is commonly known that road maintenance funds will be spent excessively on improving road performance, every country, nevertheless, dedicates considerable resources to keep the roads functional and running [16,17]. If roads are not properly and timely repaired, then the repair costs may increase. Road maintenance plans are either overlooked or given low importance [18]. The environmental and social effects of deferred maintenance are considerable because it affects the costs of maintenance.
The maintenance and recovery of roads are expensive. In 2008, the United States invested an estimated USD 182 billion in federal highway infrastructure upgrades and upkeep. Although billions are invested per year, many people believe it is inadequate [19]. According to reports, between 2008 and 2028, USD 101 billion in annual infrastructure investments would be required to maintain all of the United States’ highways in their current conditions. Therefore, road networks are declining further every year [20]. Early identification of pavement distresses and preventative repair can be achieved with the aid of technology, rather than the costlier corrective maintenance activities that would be expected after the pavement has collapsed [21,22]. With road management authorities, a pre-determined maintenance schedule for the life cycle of the pavement is typically defined, depending on the area’s survey and available funds. As a consequence, limited preventive maintenance is done to prolong the pavement life cycle, saving money for the authority. They essentially choose the worst-case scenario, allowing the pavements to deteriorate to the point of collapse without any preventative steps in place. To support good decision-making, a PMS requires an accurate and efficient pavement deterioration prediction model [23]. In addition to the prediction model, an optimization process is needed as a basic component of a PMS to guarantee the best possible pavement conditions. Thus, prediction models forecast future pavement conditions, allowing for the design of optimal maintenance strategies during the service life, and thereby reducing life-cycle costs [24].
A good PMS must be able to gather data in a reliable and repeatable way. Manual surveys were used in the past for data collection, which was time-consuming and ineffective. Automated data collection technologies, on the other hand, have been developed and continue to be a significant field of study [25]. As a deterministic regression prediction model, regression analysis is one of the most commonly utilized instruments in several research fields. It is also possible that many explanatory factors control the process of pavement degradation. The usage of a multiple regression model for pavement deterioration would be more useful [26].
The low-cost models placed tremendous stress on PMSs, which aim to align budgets with the optimum conditions for road users. PMSs are extremely data-dependent and it can be expensive and time-consuming to collect this data unless it can be efficiently automated. As a consequence, road agencies are usually limited to the use of traditional manual conditional surveys for identifying and tracking road network conditions [3]. This contributes to inefficient interventions in procedures and policies. There is a clear correlation between the number of injuries and the surface conditions [27]; hence, a common goal for all maintenance activities is to extend the life of the pavement. Pavement preservation activities used to improve pavement performance prolong the life of the pavement and improve safety. The collection and coordination of maintenance tasks is an important feature of cost-effective maintenance during the pavement life cycle. As a multi-attribute problem, such cases can be solved using an Analytical Hierarchy Process (AHP), a Fuzzy Analytical Hierarchy Process (FAHP), an Analytical Network Process (ANP), and an Analytical Neural Network (ANN) as Multi-Criteria Decision-Making Aids (MCDAs) [28].
Therefore, this study uses an ANP due to its appropriateness and finesse for such decision-making problems. This research focuses on the design of a low-cost pavement management system to make better decisions based on various flexible pavement health indicators and sub-indicators discussed in the coming sections of this paper. This model can be used in both conditions of data collection—either auto or manual road health detection. This model will guide the decision-maker in developing countries to make rapid decisions on pavement maintenance management work with the optimal treatment approach.

2. Research Methodology

A thorough literature review has been made for this research. The possible types of defects that normally occur during flexible pavement maintenance management were identified through the literature. A questionnaire was designed to get the experts’ feedback on the most common types of defects that occur in flexible pavements. The reason for expert input was to access the performance of the literature and field experience and to prioritize the defects based on local conditions. In the next phase, the possible pavement maintenance approach was also identified and reviewed by an expert in the same process for defects. The data was collected from experts working with the National Highway Authorities in Pakistan and the data covers all provinces of Pakistan. The questionnaire was distributed to 65 experts via email and hard copy. Around 52 questionnaires were successfully received from experts. Based on the nature of questions and scope, this is quite an acceptable number for data analysis [29]. There are limited experienced staff working on road maintenance plans and the questions were in the nature of who needs qualified experienced staff to respond. Most of the experts were project managers, program directors, program coordinators, directors, and site engineers. The questionnaire has three sections. In the first section, the experts were requested to share their feedback on the PMS criteria and alternatives using an ANP Scale, as shown in Table 1, in a pairwise matrix format.
In the second and third sections, the experts were requested to share their feedback on the most commonly occurring defects and their possible low-cost treatments, respectively, using two different scales, as shown in Figure 1 and Figure 2.

2.1. Data Collection and Sample Size

The significance of calculating sample sizes is underrated. The core population is a community of experts engaged with numerous pavement maintenance schemes [27]. The estimation of a sample size is often an important phase in the preparation of research studies. Insufficient or limited sampling sizes can make it difficult to show the desired difference or to reliably predict the occurrence of the event of interest. A broad sample size could increase the study’s complexity and related costs, making it unfeasible. Any of these scenarios are inappropriate and can be stopped by the investigator. Table 2 shows the confidence level of the sample size collection for this research.
The data has been analyzed by an ANP using Super Decisions Version 2.10. The ANP analysis details are given in the next sections.

2.2. Analytic Network Process (ANP)

The ANP is an extension of T. Saaty’s well-known decision-making tool, the AHP. The ANP is a dependencies-focused generalized form of the AHP. The ANP approach is a more generalized version of the AHP, which takes into account internal and external dependencies among the decision model’s elements and alternatives. The ANP deals with all forms of dependencies and inputs in the output framework in a structured manner. The well-known AHP method is a subset of the ANP, which can be extremely helpful in integrating linkages into a system. The ANP model’s composition is made up of clusters of elements that are connected by their interdependence. A cluster is a collection of elements that share a set of characteristics. Each of these clusters has at least one variable that is linked to another cluster. The movement of control between the elements is shown by these relations [32]. Since it can cope with all sorts of input and dependency while modeling a dynamic decision environment, the ANP model can offer a more precise tool for better understanding the essence of trade-offs between different parameters than traditional selection approaches. In a multi-objective and multi-stakeholder context, the ANP is useful for dealing with interdependent relationships [33]. Modeling dependencies and feedback between network components is rendered more easily with the ANP. As a result, the ANP is one of the most effective decision-making tools [34]. These dependencies, also known as feedbacks, may be modeled using the ANP method; they are more realistic and, as a result, provide more reliable outcomes. Since dependencies will exist between all of the elements in the judgment problem (i.e., alternatives, parameters, sub-criteria, and the goal), the model is no longer linear like the AHP (Figure 3), which arranges the elements in tiers. The ANP model does not need a hierarchy since clusters replace levels and each cluster includes nodes or components. The clusters are linked by a line, indicating that the elements or nodes inside them are linked.
Similarly, Figure 4 shows the influence matrix of the ANP model. It is the generic thorium that shows the numeric calculation matrices of the ANP model.
There are two layers of pairwise contrast. The cluster weights are determined using the eigenvector derived from the cluster level comparison for the control criteria. As a consequence, each of the matrix’s columns adds up to unity. If every block in the supermatrix comprises a column of zero elements, the column must be normalized after being weighted by the cluster’s weights to guarantee that the column sum is unity. The concept is similar to the Markov Chain, in which the sum of the probabilities of all states is equal to one. This matrix is called the stochastic matrix or weighted supermatrix. The weighted supermatrix is raised to a limiting power, such as in Equation (1), to get the global priority vectors [33].
lim k W k
If the supermatrix has the effect of cyclicity, there may be two or more N limiting supermatrices. In this case, the Cesaro sum is calculated as in Equation (2) to get the average priority weights [33].
lim k ( 1 N ) i = 1 n W i k

3. Pavement Maintenance Management Categories of the Proposed PMS

The PMS offers reliable evidence and valuable data interpretation to render clear, cost-effective, and defensible decisions at the level of the network and project on pavement protection. The main component of the PMS is the pavement’s functional, structural, safety, and serviceability assessments utilizing performance metrics. As shown in Figure 5, this model incorporates all forms of maintenance features needed in a comprehensive pavement maintenance program.

3.1. Routine Maintenance (RM)

The RM refers to a process of maintaining the foundations of pavements, shoulders, embankments, hydraulic frameworks, drainage systems, and road furniture against the combined effects of traffic, climate, and topography to avoid premature failures by ensuring the duration of road project construction existence and by providing the proactive maintenance activities needed every year before deterioration [36]. Most preventive maintenance is regular maintenance. It is carried out to enhance or increase a pavement’s usable existence. It is a surface treatment and operational technique planned to delay incremental deficiencies and to reduce the need for regular repair and service operations.

3.2. Periodic Maintenance (PM)

The PM indicates the procedure of rebuilding pavement structures, shoulders, embankments, hydraulic structures, drainage systems, and road surfaces to some minimum appropriate structural, functional, and safety standards. It requires the remedial maintenance activities specified in the standard operating procedure required in any given year following structural, functional, and safety deficiencies [36]. Periodic repair is often a corrective treatment, and it is long-term. It is carried out after a pavement deteriorates, such as friction failure, mild to extreme rutting, or significant cracking occurs.

3.3. Emergency Maintenance (EM)

Maintenance for emergencies is often unplanned, serious, and often detrimental. It is always a mere act of design that causes the need for maintenance in an emergency. The whole transport network may be affected by extreme rain, mudslides, floods, hurricanes, or tropical storms. Emergencies are life-threatening and road maintenance agencies need to provide an evacuation plan for when they arise, but they do not arise often. It may also be an emergency condition that requires urgent repair, such as a blowout or a serious pothole. Temporary procedures intended to keep the surface together before more extensive repairs can be performed are often identified.
A success model for total discomfort is used in several of the pavement management schemes produced by numerous highway organizations. This is largely attributable to knowledge scarcity and data unavailability in each pavement segment relevant to the past results of the distress. Similarly, a PMS also depends on the classes and severity levels of various defects the pavement encounters. In this study, we designed a fishbone indicator and sub-indicator diagram for various categories of defects considered in this PMS, as shown in Figure 6.

4. Design of ANP Decision Model for PMS

The basic ANP model is completed by specific sub-networks. The sub-networks are used to model the key features of the problem. The most important features of the PMS for maintenance management of this study are shown in an ANP-based framework with criteria and alternatives, as shown in Figure 7.

5. Results and Discussion

As discussed in the last sections, we assessed and evaluated each respondent’s feedback in this research. Based on a similar methodology, each respondent’s feedback was assessed in an ANP using the Super Decisions software tool, and the final ranking tables were generated for criteria and alternatives. Table 3 shows the synthesized results of each respondent’s feedback.
The above table shows the 52 respondents’ feedback on the criteria and indicators for the PMS. Cumulative aggregated weights were generated for each category separately using the Micro Soft Excel tool. Table 4 shows the synthesized weights of each criterion and alternative considered in this study for the PMS.
It was determined that the emergency plan is a significant plan for any low-cost pavement management system for a developing country because it assures safe traffic flow, as it is also reported by [37,38,39]. Due to road conditions, numerous accidents take place, and, in such cases, the road network gets blocked and prompt emergency response is required from all the state service-providing agencies, including the road management authority. Such cases should be covered under emergency pavement maintenance management plans. The recommencement of traffic flow is the key consideration of any road management authority in such cases, and therefore, emergency pavement maintenance management plans are given higher preferences by the experts. Second, routine maintenance plans are given priority, as also reported by [37,38]. The routine maintenance plans are short-term plans and can be managed within limited finances, as the pavement maintenance activities are normal, low-cost, and their scale is also limited. The periodic maintenance plans are third in priority; they are long-term plans and they require higher finances because pavement maintenance activities are of higher scope, time, and cost, as reported in [37,38]. These are long-term plans that include major rehabilitation of the affected sections and other activities.

6. Sensitivity Analysis of the Ranks

The objective of sensitivity analysis is to determine how changes in the numerical information of an ANP decision model affect the weight of the model’s alternatives. The numerical data involved could be information directly supplied to the model, such as pairwise data [40]. The ANP’s sensitivity study is more sophisticated and accurate than the AHP’s. Each node in the ANP may be connected to another node, while in the AHP, only one criterion weight can be changed; an isolated node must be specified to a parent node. Sensitivity tests look at how a model responds to various sources of variance, such as the input dataset, the parameters chosen, and the predictions created [41]. Such assessments enable decision-makers to assess a degree of trust in the model performance, allowing them to consider and calculate confidence intervals in the modeling results [42]. In a multi-criteria decision problem, they may also expose the relationships between input and output parameters [43]. Sensitivity analysis can be done by Super Decision. The sensitivity test is conducted phase-wise and the different incremental percentage is added in the decision to observe the possible variations in the overall decision indicators. As per the ANP sensitivity thorium, the variations in the indicators should be observed at different percentage increments in the main indicator, which is the PMS in this case. Figure 8 shows the results of 10% and 20% increments in the model.
The generic sensitivity overall model for the PMS is a normalized model, as the parameter is zero. So, in the first phase, a 10% increment was added in the main indicator and the possible variations in the sub-indicators were observed. It has been observed that there was no variation in the decisions. In contrast, it was determined that the functional and serviceability indicators had some changes in the weights, which were minor because there was no change in the ranks. All the ranks were the same and there was no change in the indicator ranks, so it can be concluded that the decision was fine, as there was no variation observed in the sub-indicators. At a 20% increment, there was no major variation observed. It was determined that the functional, safety, and serviceability indicators had some minor changes in the weights but there was no change in the ranks. All final ranks were the same and there was no change in the sub-indicator ranks. Figure 9 shows the ANP model for the emergency phase.
The generic sensitivity overall model for the emergency phase is a normalized model, as the parameter is zero. So, in the first phase, a 10% increment was added in the main indicator and the possible variations in the sub-indicators were observed. It has been observed that there was no variation in the decisions. In contrast, it was determined that the functional and serviceability indicators had some changes in the weights, which were minor because there was no change in the ranks. All the ranks were the same and there was no change in the indicator ranks, so it can be concluded that the decision was fine, as there was no variation observed in the sub-indicators. At a 20% increment, there was no major variation observed. It was determined that the functional, safety, and serviceability indicators had some minor changes in the weights but there was no change in the ranks. All final ranks were the same and there was no change in the sub-indicators rank. Figure 10 shows the ANP model for the periodic phase.
The generic sensitivity overall model for the periodic phase is a normalized model, as the parameter is at zero. It has been observed that there was no variation in the decisions at a 10% increment. In contrast, it was determined that only the functional indicators had some changes in the weights, which were minor and, thus, there was no change in the ranks. All the ranks were the same and there was no change in the indicator ranks, so there was no variation observed in the sub-indicators. It has been observed that there was no major variation in the decisions at a 20% increment. In contrast, it was determined that the functional and serviceability indicators had some changes in the weights, which were minor and, thus, there was no change in the ranks. All the ranks were the same and there was no change in the sub-indicators ranks. Figure 11 shows the ANP model for the routine phase.
The generic sensitivity overall model for the routine phase is a normalized model, as the parameter is zero. It has been observed that there was no variation in the decisions at a 10% increment. In contrast, it was determined that only the functional indicators had some changes in the weights, which were minor and, thus, there was no change in the ranks. It has been observed that there was no major variation in the decisions at a 20% increment. In contrast, it was determined that the functional and serviceability indicators had some change in the weights, which was minor and, thus, there was no change in the ranks. All the ranks were the same and there was no change in the sub-indicators ranks. It is concluded that the decision is valid.
In the next phase, the assessment of decision was analyzed with indicators by keeping one indicator as zero, and the effects on other indicators were observed at 10% and 20% variations in the decision weights on the selected indicators. Figure 12 shows the ANP model for the functional indicators.
The generic sensitivity model for the PMS with specific reference to one selected indicator and the normalized model with weights of other indicators is given. The selected indicator will be zero, as its effect will be observed over the other indicators. As per the ANP sensitivity thorium, the variations in the indicators will be observed at different percentage increments in the selected indicator, which was the functional indicator in this case. So, in the first phase, a 10% increment followed by 20% increment was added in the selected indicator and the possible variations in the other indicators were observed. It was observed that there was no major variation in the decisions observed. In contrast, it was evaluated that there was a minor change in the weights of the indicators but these new weights do not influence the indicator ranks. All the ranks were the same and there was no change in the indicator ranks. After looking at the results of the 10% and 20% increments, it can be concluded that the decision is validated. Figure 13 shows the increment results for the serviceability indicator.
So, in the first phase, a 10% increment was added, followed by 20% in the selected indicator, and the possible variations in the other indicators were observed. It was observed that there was no variation in the decisions. In contrast, it was evaluated that all indicators had some changes in the weights, which were minor. All the ranks were the same and there was no change in the indicator ranks, so it can be concluded that the decision is normalized. Figure 14 shows the ANP model for the safety indicators.
So, in the first phase, a 10% increment was added, followed by 20% in the selected indicator, and the possible variations in the other indicators were observed. It was observed that there was no major variation observed in the decisions. In contrast, it was evaluated that all indicators had some changes in the weights but all ranks were the same. Hence, it can be concluded that the decision is normalized. Figure 15 shows the ANP model for the structural indicators.
So, in the first phase, a 10% increment was added, followed by 20% in the selected indicator, and the possible variations in the other indicators were observed. It was observed that there were no major variations observed in the decisions. In contrast, it was evaluated that all indicators had some changes in the weights but all ranks were the same. Hence, it can be concluded that the decision is normalized.
As in all possible cases and comparisons, there was no major change observed in the weight, hence the final decision was fine after the detailed sensitivity assessment, so the final ANP decision ranks were final and validated for the model.
After the ranks validation, the final synchronized model is shown in Figure 16 for the low-cost PMS for pavement maintenance management proposed in this study.
The model was initiated with a clear goal to achieve the optimal decision on the priority of the pavement section to be placed first, based on the various indicators and sub-indicators discussed in the earlier sections of this paper. An updated pavement investor is very important to execute this model. The updated pavement section details will assist the decision-maker to make the pavement section health assessment and, based on the pavement condition, indices will be created. The pavement condition indices’ ranks will be aligned with the indicators and sub-indicators suggested in the model in this paper. The pavement sections will be prioritized based on the defect type and financial assessment of the required possible treatment types of the identified defect. In the next phase, the decision validation will take place and if there are major variations observed, the decision will be referred back to the section severity assessment phase to revise the sections and treatment strategies. In the case of no major change, the pavement decision will be validated and forwarded for implementation. It is also fundamental for any decision support model to observe the performance of the decision, so it is significant to monitor the decision during the implementation phase and in case of any change, proper remedial action should be taken to avoid any major problems on the project. Similarly, if one pavement section is properly finalized, it is decent to record the feedback from various key stakeholders on the project to improve the performance of the decision support model.

7. Conclusions and Recommendations

An efficient pavement management system has the potential to support pavement management authorities to make optimal decisions in developed countries. This paper suggests a PMS for making optimal decisions on pavement section selection. The indicators and sub-indicators in the model are prioritized for low cost and the model will assist in prioritizing the pavement sections, especially in developing countries like Pakistan. It is concluded in this paper that for a low-cost PMS, the emergency plan is a substantial plan for any low-cost pavement management scheme for the developing world, as it ensures safer traffic flow. Numerous accidents occur as a result of poor road conditions, and in such situations, the road network becomes blocked, necessitating an immediate emergency response from all state service companies, including the road management authority. Emergency pavement maintenance control programs should cover all situations. In such situations, the resumption of traffic flow is the most important concern for any road management authority, so emergency pavement maintenance management proposals are given higher priority by experts.
It is also concluded that routine maintenance plans stand as the second main indicator. Routine maintenance plans are short-term plans and can be managed within limited finances, as the pavement maintenance activities are normal and low cost, and their scale is also limited. The periodic maintenance programs, on the other hand, stand third in priority, and these are long-term plans. They need more funds because pavement maintenance operations are larger in scale, time, and expense. There are long-term programs that require a significant portion of recovery as well as other operations. A detailed sensitivity assessment was carried out for this study and it is concluded that the final ranks of the indicators and sub-indicators used in the PMS are validated, as there were no significant differences in the weights observed. So, the final ranks derived from the ANP model are absolute.
It is recommended that this model is utilized in low-income countries where pavement management authorities are facing financial challenges to maintain the existing road network in any country. The indicators of the proposed PMS were selected solely on their occurrence and the repair techniques or their cost. The repair techniques suggested in the decisions will be based on the defects and their possible cheap treatments to maintain road functionality and services. The indicator and sub-indicator ranks may slightly vary from country to country, but this PMS will assist the decision-makers in prioritizing the pavement sections in any maintenance plan.

Author Contributions

Conceptualization, Methodology, Formal Analysis, Write up, S.H.K. Software, Supervision, Z.A.M.; Validation, L.G., Review, Feedback & Editing, M.R.M.Y., A.R., M.M.; Supervision and Project Administration, N.I.M.Y. All authors have read and agreed to the published version of the manuscript.

Funding

The authors are thankful to Prince Sultan University, Riyadh, Saudi Arabia for providing financial assistance (Article Processing Charges) and scholarly support for this publication.

Institutional Review Board Statement

Not applicable.

Informed Consent Statement

Not applicable.

Data Availability Statement

The data presented in this study are available on request from the corresponding author. The data are not publicly available due to privacy purposes and permissions from the concerned departments.

Conflicts of Interest

The authors declare no conflict of interest.

References

  1. The Economic Times. Why Transport Infrastructure Is Most Important for Country’s Progress. 2016. Available online: https://economictimes.indiatimes.com/why-transport-infrastructure-is-most-important-for-countrys-progress/articleshow/50865730.cms (accessed on 10 February 2016).
  2. Chandio, I.A.; Matori, A.N.B.; Wanyusof, K.B.; Talpur, M.A.H.; Khahro, S.H.; Mokhtar, M.R.M. Computer Application in Routing of Road using Least-Cost Path Analysis in Hillside Development. Res. J. Environ. Earth Sci. 2012, 4, 907–911. [Google Scholar]
  3. Yusufzai, A. NHA Increases Toll Rates Across Pakistan. 2018. Available online: https://propakistani.pk/2018/08/03/nha-increases-toll-rates-across-pakistan/ (accessed on 3 August 2018).
  4. Manosalvas-Paredes, M.; Roberts, R.; Barriera, M.; Mantalovas, K. Towards more sustainable pavement management practices using embedded sensor technologies. Infrastructures 2020, 5, 4. [Google Scholar] [CrossRef] [Green Version]
  5. Alam, S.; Kumar, A. “Road Use Phase” Environmental Indicator for Sustainable Pavement Management System. In Proceedings of the Eighth International Conference on Maintenance and Rehabilitation of Pavements; Research Publishing: Singapore, 2016; pp. 756–764. [Google Scholar]
  6. Bernas, M.; Płaczek, B.; Korski, W.; Loska, P.; Smyła, J.; Szymała, P. A survey and comparison of low-cost sensing technologies for road traffic monitoring. Sensors 2018, 18, 3243. [Google Scholar] [CrossRef] [Green Version]
  7. Roberts, R.; Giancontieri, G.; Inzerillo, L.; Di Mino, G. Towards Low-Cost Pavement Condition Health Monitoring and Analysis Using Deep Learning. Appl. Sci. 2020, 10, 319. [Google Scholar] [CrossRef] [Green Version]
  8. Bidgoli, M.A.; Golroo, A.; Nadjar, H.S.; Rashidabad, A.G.; Ganji, M.R. Road roughness measurement using a cost-effective sensor-based monitoring system. Autom. Constr. 2019, 104, 140–152. [Google Scholar] [CrossRef]
  9. American Association of State Highway and Transportation Officials. Pavement Management Guide; American Association of State Highway and Transportation Officials: Washington, DC, USA, 2012. [Google Scholar]
  10. Merritt, D.K.; Lyon, C.; Persaud, B. Evaluation of Pavement Safety Performance; United States. Federal Highway: McLean, VA, USA, 2015. [Google Scholar]
  11. Ceylan, H.; Gopalakrishnan, K.; Kim, S.; Taylor, P.C.; Prokudin, M.; Buss, A.F. Highway Infrastructure Health Monitoring Using Micro-Electromechanical Sensors And Systems (Mems). J. Civ. Eng. Manag. 2014, 19, S188–S201. [Google Scholar] [CrossRef]
  12. Henning, T.F.P.; Alabaster, D.; Arnold, G.; Liu, W. Relationship between Traffic Loading and Environmental Factors and Low-Volume Road Deterioration. Transp. Res. Rec. J. Transp. Res. Board 2014, 2433, 100–107. [Google Scholar] [CrossRef]
  13. Inzerillo, L.; Di Mino, G.; Roberts, R. Image-based 3D reconstruction using traditional and UAV datasets for analysis of road pavement distress. Autom. Constr. 2018, 96, 457–469. [Google Scholar] [CrossRef]
  14. Salas, M.Á.; Pérez-Acebo, H.; Calderón, V.; Gonzalo-Orden, H. Bitumen modified with recycled polyurethane foam for employment in hot mix asphalt. Ing. Investig. 2018, 38, 60–66. [Google Scholar] [CrossRef]
  15. Xiong, H.; Shi, Q.; Tao, X.; Wang, W. A Compromise Programming Model for Highway Maintenance Resources Allocation Problem. Math. Probl. Eng. 2012, 2012, 178651. [Google Scholar] [CrossRef]
  16. Lee, E.-B.; Thomas, D.K.; Alleman, D. Incorporating Road User Costs into Integrated Life-Cycle Cost Analyses for Infrastructure Sustainability: A Case Study on Sr-91 Corridor Improvement Project (Ca). Sustainability 2018, 10, 179. [Google Scholar] [CrossRef] [Green Version]
  17. Giunta, M.; Bressi, S.; D’Angelo, G. Life cycle cost assessment of bitumen stabilised ballast: A novel maintenance strategy for railway track-bed. Constr. Build. Mater. 2018, 172, 751–759. [Google Scholar] [CrossRef]
  18. Zhang, Y.; Mohsen, J. A Project-Based Sustainability Rating Tool for Pavement Maintenance. Engineering 2018, 4, 200–208. [Google Scholar] [CrossRef]
  19. Schnebele, E.; Tanyu, B.F.; Cervone, G.; Waters, N.M. Review of remote sensing methodologies for pavement management and assessment. Eur. Transp. Res. Rev. 2015, 7, 7. [Google Scholar] [CrossRef] [Green Version]
  20. ASCE. Report Card for Infrastructure; ASCE: Reston, VA, USA, 2013. [Google Scholar]
  21. Duong, N.S.; Blanc, J.; Hornych, P.; Bouveret, B.; Carroget, J.; Le feuvre, Y. Continuous strain monitoring of an instrumented pavement section. Int. J. Pavement Eng. 2019, 20, 1435–1450. [Google Scholar] [CrossRef]
  22. Blanc, J.; Hornych, P.; Duong, N.S.; Blanchard, J.-Y.; Nicollet, P. Monitoring of an experimental motorway section. Road Mater. Pavement Des. 2017, 20, 74–89. [Google Scholar] [CrossRef]
  23. Hassan, R.; Lin, O.; Thananjeyan, A. A comparison between three approaches for modelling deterioration of five pavement surfaces. Int. J. Pavement Eng. 2017, 18, 26–35. [Google Scholar] [CrossRef]
  24. Dong, Q.; Huang, B.; Richards, S.H. Calibration and Application of Treatment Performance Models in a Pavement Management System in Tennessee. J. Transp. Eng. 2015, 141, 04014076. [Google Scholar] [CrossRef]
  25. Alyami, Z.; Farashah, M.K.; Tighe, S.L. Selection of Automated Data Collection Technologies Using Multi Criteria Decision Making Approach for Pavement Management Systems. In Proceedings of the Annual Conference of the Canadian Society for Civil Engineering, 2012: Leadership in Sustainable Infrastructure, Montreal, QC, Canada, 5–8 June 2012; Canadian Society for Civil Engineering (CSCE): Montreal, QC, Canada, 2012; pp. 1712–1721. [Google Scholar]
  26. Suharman, H. Development of a Practical Model for Pavement Management Systems. Ph.D. Thesis, Kyoto University, Kyoto, Japan, 2012. [Google Scholar]
  27. Radopoulou, S.C.; Brilakis, I. Improving Road Asset Condition Monitoring. Transp. Res. Procedia 2016, 14, 3004–3012. [Google Scholar] [CrossRef] [Green Version]
  28. Ozdemir, M.S. Validity and inconsistency in the analytic hierarchy process. Appl. Math. Comput. 2005, 161, 707–720. [Google Scholar] [CrossRef]
  29. Daud, S.M.; Ramli, R.; Kasim, M.M.; Kayat, K.; Razak, R.A. The use of arithmetic average method in identifying critical success criteria for Homestay Programmes. In Innovation and Analytics Conference and Exhibition (IACE 2015), Proceedings of the 2nd Innovation and Analytics Conference & Exhibition, Kedah, Malaysia, 29 September–1 October 2015; AIP Conference Proceedings: College Park, MD, USA, 2015; Volume 1691, p. 050006. [Google Scholar] [CrossRef]
  30. Saaty, T.L. Analytic Network Process. In Encyclopedia of Operations Research and Management Science; Springer: New York, NY, USA, 2011. [Google Scholar]
  31. Boyd, P.C.; Manheim, P.; Buhsmer, K. The Research Advisors. Available online: https://www.research-advisors.com/tools/SampleSize.htm (accessed on 29 April 2021).
  32. Saaty, T.L. Decision making—The Analytic Hierarchy and Network Processes (AHP/ANP). J. Syst. Sci. Syst. Eng. 2004, 13, 1–35. [Google Scholar] [CrossRef]
  33. Piantanakulchai, M. Analytic Network Process Model for Highway Corridor. In Proceedings of the International Symposium on the Analytic Hierarchy Process for Multi-criteria Decision Making, Honolulu, HI, USA, 8–10 July 2005. [Google Scholar]
  34. Kadoić, N.; Ređep, N.B.; Divjak, B. Decision Making With the Analytic Network Process. In Proceedings of the 14th International Symposium on Operational, Bled, Slovenija, 27–29 September 2017; pp. 180–186. [Google Scholar]
  35. Lotfi, S.; Habibi, K.; Koohsari, M.J. Integrating multi-criteria models and Geographical information system for cemetery site selection (a case study of the Sanandaj city, Iran). Acta Geogr. Slov. 2009, 49, 179–198. [Google Scholar] [CrossRef] [Green Version]
  36. Ministry of Communications, “Gazette Of Pakistan”. Available online: http://nha.gov.pk/wp-content/uploads/2016/04/nha-code-2005-volume-II.pdf (accessed on 21 August 2016).
  37. The University of Birmingham; The University of Nottingham. Selection and Operation of Maintenance Management Systems. Available online: https://assets.publishing.service.gov.uk/media/57a08d8440f0b649740018e2/R6852B.pdf (accessed on 10 February 2000).
  38. Wilde, W.J. Cost-Effective Pavement Preservation Solutions for the Real World; Minnesota Department of Transportation Research Services & Library: St. Paul, MN, USA, 2014. [Google Scholar]
  39. Mndot. Transportation Asset Management Plan; Minnesota Department of Transportation: St. Paul, MN, USA, 2014. [Google Scholar]
  40. Adams, B. ANP Row Sensitivity. 2011. Available online: http://www.isahp.org/uploads/3_0104_adams.pdf (accessed on 10 May 2011).
  41. Tenerelli, P.; Carver, S. Multi-criteria, multi-objective and uncertainty analysis for agro-energy spatial modelling. Appl. Geogr. 2012, 32, 724–736. [Google Scholar] [CrossRef]
  42. Chen, J.; Yang, Y. A Fuzzy ANP-Based Approach to Evaluate Region Agricultural Drought Risk. Procedia Eng. 2011, 23, 822–827. [Google Scholar] [CrossRef] [Green Version]
  43. Chen, Y.; Khan, S.; Paydar, Z. To retire or expand? A fuzzy GIS-based spatial multi-criteria evaluation framework for irrigated agriculture. Irrig. Drain. 2009, 59, 174–188. [Google Scholar] [CrossRef]
Figure 1. Scale for defect frequency of occurrence.
Figure 1. Scale for defect frequency of occurrence.
Sustainability 13 05941 g001
Figure 2. Scale for defect low-cost treatment type.
Figure 2. Scale for defect low-cost treatment type.
Sustainability 13 05941 g002
Figure 3. AHP and ANP decision processes [35].
Figure 3. AHP and ANP decision processes [35].
Sustainability 13 05941 g003
Figure 4. ANP influence matrix [35].
Figure 4. ANP influence matrix [35].
Sustainability 13 05941 g004
Figure 5. PMS framework for the PMM.
Figure 5. PMS framework for the PMM.
Sustainability 13 05941 g005
Figure 6. Pavement maintenance indicators fishbone diagram.
Figure 6. Pavement maintenance indicators fishbone diagram.
Sustainability 13 05941 g006
Figure 7. ANP model for the proposed PMS.
Figure 7. ANP model for the proposed PMS.
Sustainability 13 05941 g007
Figure 8. Sensitivity assessment of the PMS.
Figure 8. Sensitivity assessment of the PMS.
Sustainability 13 05941 g008
Figure 9. Sensitivity assessment of the emergency phase.
Figure 9. Sensitivity assessment of the emergency phase.
Sustainability 13 05941 g009
Figure 10. Sensitivity assessment of the periodic phase.
Figure 10. Sensitivity assessment of the periodic phase.
Sustainability 13 05941 g010
Figure 11. Sensitivity assessment of the routine phase.
Figure 11. Sensitivity assessment of the routine phase.
Sustainability 13 05941 g011
Figure 12. Sensitivity assessment of the functional indicators.
Figure 12. Sensitivity assessment of the functional indicators.
Sustainability 13 05941 g012
Figure 13. Sensitivity assessment of the serviceability indicators.
Figure 13. Sensitivity assessment of the serviceability indicators.
Sustainability 13 05941 g013
Figure 14. Sensitivity assessment of the safety indicators.
Figure 14. Sensitivity assessment of the safety indicators.
Sustainability 13 05941 g014
Figure 15. Sensitivity assessment of the structural indicators.
Figure 15. Sensitivity assessment of the structural indicators.
Sustainability 13 05941 g015
Figure 16. The proposed PMS framework.
Figure 16. The proposed PMS framework.
Sustainability 13 05941 g016
Table 1. Scale for pairwise comparison [30].
Table 1. Scale for pairwise comparison [30].
Intensity of ImportanceDefinition
1Equal importance
3Moderate importance
5Strong importance
7Very strong importance
9Extreme importance
2, 4, 6, 8Intermediate values between adjacent scale values
Table 2. Sample size with confidence levels [31].
Table 2. Sample size with confidence levels [31].
Population SizeConfidence = 95%
Margin of Error
Confidence = 96%
Margin of Error
5.0%3.5%2.5%1.0%5.0%3.5%2.5%1.0%
101010101010101010
201920202019202020
302829293029293030
504447485047484950
756369727467717375
1008089949987939699
150108126137148122135142149
200132160177196154174186198
250152190215244182211229246
300169217251291207246270295
Table 3. Synthesized indicator values of each respondent.
Table 3. Synthesized indicator values of each respondent.
Normalized Cluster Values of Each Respondent Indicators
Functional IndicatorsSafety IndicatorsServiceability IndicatorsStructural IndicatorsEmergencyPeriodicRoutine
Q10.23810.50380.14780.11020.42300.173130.4038
Q20.61010.23020.06010.09960.30120.38680.3120
Q30.51230.15020.01940.31810.55200.03380.4142
Q40.29100.21120.10670.39110.29140.09650.6121
Q50.21200.43670.11010.24120.30210.18720.5107
Q60.23810.50380.14780.11020.42300.210370.3665
Q70.31300.21010.14780.32900.49310.15130.355
Q80.29100.21120.27120.22660.51190.15230.3358
Q90.41230.15020.06130.37620.33890.26010.4010
Q100.31300.21010.14780.32900.40210.18910.4088
Q110.41010.23020.06010.29960.38990.15940.4507
Q120.23810.30380.14780.31020.44790.18470.3674
Q130.51230.15020.31200.02550.60330.09340.3033
Q140.43810.30380.14780.11020.55810.12040.3215
Q150.33560.21120.29750.15570.42300.173130.4038
Q160.23810.20380.14780.41020.50760.10350.3889
Q170.39050.11050.24080.25820.71420.03470.2511
Q180.51230.15020.31200.02550.44950.12770.4228
Q190.23810.07140.17840.51200.42300.17310.4038
Q200.29100.21120.09860.39920.21480.20400.5812
Q210.61010.23020.06010.09960.33300.28150.3855
Q220.39130.15020.31200.14650.44950.12770.4228
Q230.31300.21010.14780.32900.55810.12040.3215
Q240.51230.15020.1040.23280.38990.15940.4507
Q250.61010.23020.06010.09960.42300.17310.4038
Q260.17700.28730.15560.38000.30120.38680.3120
Q270.29100.21120.02660.47120.60330.09340.3033
Q280.39390.31240.02060.27310.42300.17310.4038
Q290.41010.23020.06010.29960.71420.03470.2511
Q300.23810.20380.19620.36180.42300.17310.4038
Q310.49500.15020.04280.3120.29140.09650.6121
Q320.20180.24010.14780.41020.33890.26010.4010
Q330.29100.21120.47120.02660.33300.28150.3855
Q340.23810.20170.14780.41230.30120.38680.3120
Q350.61010.23020.06010.09960.60330.09340.3033
Q360.23810.28040.14780.33360.29140.09650.6121
Q370.37700.28730.15560.18000.42300.21030.3665
Q380.51230.15020.31200.02550.29140.09650.6121
Q390.23810.26860.14780.34540.51190.15230.3358
Q400.61010.23020.06010.09960.44790.18470.3674
Q410.23810.20380.14780.41020.60330.09340.3033
Q420.29100.21120.07120.42660.71420.12040.1654
Q430.23810.30380.14780.31020.44950.12770.4228
Q440.51230.15020.31200.02550.21480.20400.5812
Q450.38810.23020.06010.32160.29140.09650.6121
Q460.37700.28730.15560.18000.42300.18470.3922
Q470.29100.21120.37320.12460.52100.04930.4297
Q480.23810.29070.14780.32330.30120.38680.3120
Q490.23810.20380.14780.41020.42300.21030.3665
Q500.21930.15020.31200.31850.71420.03470.2511
Q510.27000.21120.12870.39010.21480.20400.5812
Q520.31010.23020.14230.31740.44230.12040.4373
Overall Average0.35390.22910.15660.26020.43330.16590.4006
Overall Average in %35.3922.9115.6626.0243.3316.5940.06
Table 4. Final synthesized weights of the PMS.
Table 4. Final synthesized weights of the PMS.
GoalPMS IndicatorsNormalized by ClusterNormalized by Cluster %
CriteriaEmergency0.4072740.727
Periodic0.2042420.424
Routine0.3884938.849
Criterion Weight Sum1100%
AlternativeFunctional Indicators0.32393444232.39344423
Safety Indicators0.2379923.799
Serviceability Indicators0.1779717.797
Structural Indicators0.2601126.011
Alternative Weight Sum1100%
Publisher’s Note: MDPI stays neutral with regard to jurisdictional claims in published maps and institutional affiliations.

Share and Cite

MDPI and ACS Style

Khahro, S.H.; Memon, Z.A.; Gungat, L.; Yazid, M.R.M.; Rahim, A.; Mubaraki, M.; Md. Yusoff, N.I. Low-Cost Pavement Management System for Developing Countries. Sustainability 2021, 13, 5941. https://0-doi-org.brum.beds.ac.uk/10.3390/su13115941

AMA Style

Khahro SH, Memon ZA, Gungat L, Yazid MRM, Rahim A, Mubaraki M, Md. Yusoff NI. Low-Cost Pavement Management System for Developing Countries. Sustainability. 2021; 13(11):5941. https://0-doi-org.brum.beds.ac.uk/10.3390/su13115941

Chicago/Turabian Style

Khahro, Shabir Hussain, Zubair Ahmed Memon, Lillian Gungat, Muhamad Razuhanafi Mat Yazid, Abdur Rahim, Muhammad Mubaraki, and Nur Izzi Md. Yusoff. 2021. "Low-Cost Pavement Management System for Developing Countries" Sustainability 13, no. 11: 5941. https://0-doi-org.brum.beds.ac.uk/10.3390/su13115941

Note that from the first issue of 2016, this journal uses article numbers instead of page numbers. See further details here.

Article Metrics

Back to TopTop